If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524262606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.517711,"lon":-113.728756,"icon":""}]} |
| Location: 00/06-26-052-26W4/0 | |
| Location Alias: 00/06-26-52-26 W4M | |
| Location Alias 2: 00/06-26-052-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 26 | |
| County/Municipality: Parkland County | |
| Well Name: CEDAR CREEK ACH 6-26-52-26 | |
| Operator Name: MAGA Energy Operations Ltd. | |
| License Number: 0003302 | |
| License Date: 1951-08-10 | |
| License Status: Suspension | |
| Spud Date: 1951-08-14 | |
| Final Drill Date: 1951-09-12 | |
| Well Total Depth: 1584.00 m | |
| Surface Hole Latitude: 53.517711 | |
| Surface Hole Longitude: -113.728756 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-08-10 | Obtained License |
| 1951-09-09 | Production Casing Operation Performed |
| 1951-09-12 | Finished Drilling |
| 1951-09-12 | Perforation Treatment Performed - Open-Hole Completion |
| 1951-09-12 | Well Mode changed to Drilled and Cased |
| 1951-09-15 | Well Began Production |
| 1951-09-15 | Well Fluid changed to Crude Oil |
| 1951-09-15 | Well Mode changed to Flowing |
| 1970-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1970-11-05 | Perforation Treatment Performed - Jet Perforation |
| 1970-11-05 | Well Fluid changed to Crude Oil |
| 1970-11-05 | Well Mode changed to Abandoned Zone |
| 1970-11-09 | Perforation Treatment Performed - Jet Perforation |
| 1993-02-06 | Perforation Treatment Performed - Cement Squeeze |
| 1993-02-16 | Well Log Performed |
| 1993-02-17 | Perforation Treatment Performed - Open-Hole Completion |
| 1993-02-17 | Well Log Performed |
| 1993-02-23 | Liner Casing Operation Performed |
| 1993-02-23 | Perforation Treatment Performed - Cement Squeeze |
| 1993-02-25 | Perforation Treatment Performed - Jet Perforation |
| 1993-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-02-26 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-01 | Well Fluid changed to Crude Oil |
| 1993-03-01 | Well Mode changed to Gas Lift |
| 1993-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-07-15 | Well Log Performed |
| 1993-07-16 | Well Log Performed |
| 1996-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-11-04 | Plug Back Performed |
| 2005-11-04 | Well Fluid changed to Crude Oil |
| 2005-11-04 | Well Mode changed to Abandoned Zone |
| 2005-11-06 | Well Log Performed |
| 2005-11-07 | Perforation Treatment Performed - Jet Perforation |
| 2007-05-13 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-09-12 | Open Hole/Barefoot Completion | 1516.10 | 1549.90 | 0 |
| 1993-02-25 | Perforation | 1539.20 | 1539.70 | 20 |
| 1993-02-25 | Perforation | 1541.40 | 1541.90 | 20 |
| 1993-02-25 | Perforation | 1543.60 | 1544.10 | 20 |
| 1993-02-25 | Perforation | 1545.80 | 1546.30 | 20 |
| 1993-02-25 | Perforation | 1548.00 | 1548.50 | 20 |
| 1993-02-26 | Perforation | 1531.00 | 1531.50 | 20 |
| 1993-02-26 | Acid Treatment | 1531.00 | 1548.50 | 0 |
| 1993-05-19 | Acid Treatment | 1534.00 | 1535.30 | 0 |
| 1996-10-05 | Acid Treatment | 1531.00 | 1548.50 | 0 |
| 2005-11-04 | Packing Device Capped w/Cement | 1512.00 | 1520.00 | 0 |
| 1970-11-02 | Packing Device Capped w/Cement | 1488.30 | 1493.50 | 0 |
| 2005-11-07 | Perforation | 1253.50 | 1254.80 | 20 |
| 2005-11-07 | Perforation | 1250.20 | 1252.60 | 20 |
| 1970-11-05 | Perforation | 1255.80 | 1256.70 | 7 |
| 1970-11-09 | Perforation | 1258.80 | 1259.40 | 7 |
| 1993-02-06 | Cement Squeeze | 1255.80 | 1259.40 | 0 |
| 1993-02-17 | Open Hole/Barefoot Completion | 1516.10 | 1584.00 | 0 |
| 1993-02-23 | Cement Squeeze | 1516.10 | 1584.00 | 0 |
| 1993-02-25 | Perforation | 1534.00 | 1535.30 | 20 |
| 1993-02-25 | Perforation | 1537.00 | 1537.50 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 4340 | 0.0 | 0.0 | 0.0 |
| 1993 | 3718 | 0.0 | 0.0 | 0.0 |
| 1994 | 4530 | 0.0 | 0.0 | 0.0 |
| 1995 | 72 | 0.0 | 0.0 | 0.0 |
| 1996 | 1862 | 0.0 | 0.0 | 0.0 |
| 1997 | 5896 | 0.0 | 0.0 | 0.0 |
| 1998 | 8258 | 0.0 | 0.0 | 0.0 |
| 1999 | 3651 | 0.0 | 0.0 | 0.0 |
| 2000 | 3128 | 0.0 | 0.0 | 0.0 |
| 2001 | 4247 | 0.0 | 0.0 | 0.0 |
| 2002 | 5236 | 0.0 | 0.0 | 0.0 |
| 2003 | 296 | 0.0 | 0.0 | 0.0 |
| 2004 | 1776 | 0.0 | 0.0 | 0.0 |
| 2005 | 2428 | 0.0 | 0.0 | 0.0 |
For data sources see[5]