If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524262306004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.503082,"lon":-113.72875,"icon":""}]} |
| Location: 00/06-23-052-26W4/4 | |
| Location Alias: 00/06-23-52-26 W4M | |
| Location Alias 2: 00/06-23-052-26 W4/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 23 | |
| County/Municipality: Stony Plain 135 | |
| Well Name: CEDAR CREEK ACH 6-23-52-26 | |
| Operator Name: MAGA Energy Operations Ltd. | |
| License Number: 0002755 | |
| License Date: 1951-04-07 | |
| License Status: Suspension | |
| Spud Date: 1951-04-20 | |
| Final Drill Date: 1951-06-20 | |
| Well Total Depth: 1544.70 m | |
| Surface Hole Latitude: 53.503082 | |
| Surface Hole Longitude: -113.728750 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-04-07 | Obtained License |
| 1951-05-03 | Drill Stem Test Performed |
| 1951-05-05 | Drill Stem Test Performed |
| 1951-05-06 | Drill Stem Test Performed |
| 1951-05-07 | Drill Stem Test Performed |
| 1951-05-10 | Drill Stem Test Performed |
| 1951-05-11 | Drill Stem Test Performed |
| 1951-05-14 | Drill Stem Test Performed |
| 1951-05-15 | Drill Stem Test Performed |
| 1951-05-17 | Drill Stem Test Performed |
| 1951-05-19 | Drill Stem Test Performed |
| 1951-05-20 | Drill Stem Test Performed |
| 1951-05-23 | Drill Stem Test Performed |
| 1951-05-24 | Drill Stem Test Performed |
| 1951-05-25 | Drill Stem Test Performed |
| 1951-05-29 | Drill Stem Test Performed |
| 1951-06-03 | Drill Stem Test Performed |
| 1951-06-04 | Drill Stem Test Performed |
| 1951-06-05 | Drill Stem Test Performed |
| 1951-06-06 | Drill Stem Test Performed |
| 1951-06-07 | Drill Stem Test Performed |
| 1951-06-17 | Production Casing Operation Performed |
| 1951-06-20 | Finished Drilling |
| 1951-06-20 | Well Mode changed to Drilled and Cased |
| 1951-06-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2006-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-11-01 | Plug Back Performed |
| 2006-11-02 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-05-30 | Plug Back Performed |
| 2007-05-31 | Perforation Treatment Performed - Jet Perforation |
| 2007-06-05 | Perforation Treatment Performed - Fractured |
| 2008-05-12 | Well Log Performed |
| 2008-05-13 | Perforation Treatment Performed - Jet Perforation |
| 2008-07-01 | Well Began Production |
| 2008-07-01 | Well Fluid changed to Gas |
| 2008-07-01 | Well Mode changed to Pumping |
| 2013-08-22 | Perforation Treatment Performed - Cement Squeeze |
| 2013-08-22 | Plug Back Performed |
| 2013-08-22 | Well Fluid changed to Gas |
| 2013-08-22 | Well Mode changed to Abandoned Zone |
| 2013-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2013-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-03 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-06-21 | Open Hole/Barefoot Completion | 1527.00 | 1544.70 | 0 |
| 2007-05-31 | Perforation | 1247.90 | 1250.90 | 20 |
| 2007-06-05 | Fracture | 1247.90 | 1250.90 | 0 |
| 2008-05-13 | Perforation | 1297.00 | 1300.00 | 20 |
| 2013-08-22 | Cement Squeeze | 1247.90 | 1250.90 | 0 |
| 2013-08-22 | Cement Squeeze | 1297.00 | 1300.00 | 0 |
| 2013-08-28 | Perforation | 1440.80 | 1441.70 | 20 |
| 2013-08-28 | Perforation | 1437.10 | 1439.60 | 20 |
| 2013-08-29 | Packing Device Capped w/Cement | 1437.10 | 1441.70 | 0 |
| 2013-09-03 | Open Hole/Barefoot Completion | 1527.00 | 1544.70 | 0 |
| 2006-11-01 | Packing Device Capped w/Cement | 1505.00 | 1513.00 | 0 |
| 2006-11-02 | Perforation | 1437.10 | 1439.60 | 20 |
| 2006-11-02 | Perforation | 1440.80 | 1441.70 | 20 |
| 2006-11-05 | Acid Treatment | 1440.80 | 1441.70 | 0 |
| 2006-11-05 | Acid Treatment | 1438.80 | 1439.60 | 0 |
| 2007-01-19 | Acid Treatment | 1437.10 | 1439.60 | 0 |
| 2007-01-19 | Acid Treatment | 1440.80 | 1441.70 | 0 |
| 2007-05-30 | Packing Device Capped w/Cement | 1428.00 | 1430.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 4251 | 0.0 | 0.0 | 0.0 |
| 2009 | 8483 | 0.0 | 0.0 | 0.0 |
| 2010 | 6054 | 0.0 | 0.0 | 0.0 |
| 2011 | 3128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]