X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524253012000

Well Details

Well ID: 0524253012000
Loading map...
Location: 00/12-30-052-25W4/0
Location Alias: 00/12-30-52-25 W4M
Location Alias 2: 00/12-30-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 30
County/Municipality: Edmonton
Well Name: DUE WEST ACHESON EAST 12-30-52-25
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0097997
License Date: 1982-10-15
License Status: Abandoned
Spud Date: 1983-06-04
Final Drill Date: 1983-06-22
Well Total Depth: 1500.00 m
Surface Hole Latitude: 53.524966
Surface Hole Longitude: -113.679693

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-15 Obtained License
1983-06-04 Direction Drilling Operation Performed - 98
1983-06-22 Finished Drilling
1983-06-22 Well Log Performed
1983-06-22 Well Mode changed to Drilled and Cased
1983-06-24 Production Casing Operation Performed
1983-08-17 Perforation Treatment Performed - Jet Perforation
1983-09-24 Perforation Treatment Performed - Jet Perforation
1983-09-25 Perforation Treatment Performed - Cement Squeeze
1983-09-27 Perforation Treatment Performed - Jet Perforation
1983-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-01 Well Began Production
1983-10-01 Well Fluid changed to Crude Oil
1983-10-01 Well Mode changed to Pumping
1991-01-28 Perforation Treatment Performed - Jet Perforation
1991-01-28 Well Log Performed
1991-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-03 Perforation Treatment Performed - Cement Squeeze
1996-05-07 Perforation Treatment Performed - Jet Perforation
1996-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-28 Well Log Performed
1996-06-29 Perforation Treatment Performed - Jet Perforation
1997-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-11 Well Fluid changed to Crude Oil
2001-10-11 Well Mode changed to Flowing
2002-10-16 Well Log Performed
2002-10-19 Perforation Treatment Performed - Remedial Casing
2002-10-25 Perforation Treatment Performed - Jet Perforation
2002-10-25 Well Log Performed
2002-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-03 Well Log Performed
2003-02-01 Well Began Injection
2003-02-01 Well Fluid changed to Water
2003-02-01 Well Type changed to Disposal
2010-07-01 Well Fluid changed to Water
2010-07-01 Well Mode changed to Suspended
2010-07-01 Well Type changed to Disposal
2010-08-16 Perforation Treatment Performed - Jet Perforation
2010-08-18 Perforation Treatment Performed - Remedial Casing
2010-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-12 Perforation Treatment Performed - Cement Squeeze
2010-09-12 Plug Back Performed
2010-09-12 Well Fluid changed to Water
2010-09-12 Well Mode changed to Abandoned Zone
2010-09-12 Well Type changed to Disposal
2010-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-04 Plug Back Performed
2010-10-04 Well Log Performed
2010-10-08 Well Abandoned
2010-10-08 Well Fluid changed to Water
2010-10-08 Well Mode changed to Abandoned
2010-10-08 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-06-04 190.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-17 Perforation 1416.00 1419.60 13
1996-05-03 Cement Squeeze 1415.00 1422.00 0
1996-05-07 Perforation 1411.00 1417.00 18
1996-05-09 Acid Treatment 1411.00 1417.00 0
1996-06-29 Perforation 1401.50 1404.00 18
1997-04-09 Acid Treatment 1401.00 1403.10 0
2002-10-19 Remedial Casing Cementing 1401.50 1404.00 0
2002-10-25 Perforation 1422.00 1458.00 17
2002-10-29 Acid Treatment 1422.00 1458.00 0
2002-10-30 Acid Treatment 1422.00 1458.00 0
2010-08-16 Perforation 287.00 288.00 13
1983-09-24 Perforation 1425.50 1429.00 13
2010-08-18 Remedial Casing Cementing 287.00 288.00 0
2010-09-12 Cement Squeeze 1411.00 1458.00 0
2010-09-12 Packing Device Capped w/Cement 1370.00 1388.50 0
2010-10-04 Packing Device Capped w/Cement 272.00 280.00 0
1983-09-25 Cement Squeeze 1425.50 1429.00 0
1983-09-27 Perforation 1416.00 1418.50 13
1983-09-28 Acid Treatment 1416.00 1419.60 0
1983-09-29 Acid Treatment 1416.00 1419.60 0
1991-01-28 Perforation 1415.00 1422.00 13
1991-06-04 Acid Treatment 1415.00 1422.00 0
1992-01-22 Acid Treatment 1415.00 1422.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1186 0.0 0.0 0.0
1984 7275 0.0 0.0 0.0
1985 7778 0.0 0.0 0.0
1986 8235 0.0 0.0 0.0
1987 8495 0.0 0.0 0.0
1988 8487 0.0 0.0 0.0
1989 8601 0.0 0.0 0.0
1990 8412 0.0 0.0 0.0
1991 7994 0.0 0.0 0.0
1992 8467 0.0 0.0 0.0
1993 8609 0.0 0.0 0.0
1994 8487 0.0 0.0 0.0
1995 6067 0.0 0.0 0.0
1996 5348 0.0 0.0 0.0
1997 5966 0.0 0.0 0.0
2001 1196 0.0 0.0 0.0
2002 719 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0

For data sources see[6]

References