X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524253002020

Well Details

Well ID: 0524253002020
Loading map...
Location: 02/02-30-052-25W4/0
Location Alias: 02/02-30-52-25 W4M
Location Alias 2: 02/02-30-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 30
County/Municipality: Edmonton
Well Name: LEDDY ACHE 2-30BQ-52-25
Operator Name: Leddy Exploration Limited
License Number: 0140114
License Date: 1989-06-13
License Status: Abandoned
Spud Date: 1989-07-14
Final Drill Date: 1989-07-20
Well Total Depth: 1304.00 m
Surface Hole Latitude: 53.514247
Surface Hole Longitude: -113.673628

For data sources see[1][2]

Well History

Date Event
1989-06-13 Obtained License
1989-07-15 Lost Circulation Occurred
1989-07-16 Direction Drilling Operation Performed - Deviate
1989-07-16 Surface Casing Operation Performed
1989-07-20 Finished Drilling
1989-07-20 Well Log Performed
1989-07-20 Well Mode changed to Drilled and Cased
1989-07-21 Production Casing Operation Performed
1989-07-21 Rig Released
1989-07-24 Well Log Performed
1989-07-27 Perforation Treatment Performed - Jet Perforation
1989-07-28 Perforation Treatment Performed - Jet Perforation
1989-07-29 Well Began Production
1989-07-29 Well Fluid changed to Crude Oil
1989-07-29 Well Mode changed to Pumping
1994-09-26 Perforation Treatment Performed - Jet Perforation
2011-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-02 Perforation Treatment Performed - Cement Squeeze
2011-09-02 Perforation Treatment Performed - Jet Perforation
2011-10-19 Well Abandoned
2012-05-28 Well Fluid changed to Crude Oil
2012-05-28 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-07-16 320.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-27 Perforation 1270.20 1271.20 14
1989-07-28 Perforation 1270.20 1271.20 14
1994-09-26 Perforation 1259.00 1262.00 13
2011-08-31 Packing Device Capped w/Cement 1237.00 1245.00 0
2011-09-02 Packing Device Capped w/Cement 1173.00 1181.00 0
2011-09-02 Perforation 302.00 302.50 17
2011-09-02 Cement Squeeze 302.00 302.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 3720 0.0 0.0 0.0
1990 8520 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 6575 0.0 0.0 0.0
1995 8687 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 7871 0.0 0.0 0.0
1998 4032 0.0 0.0 0.0
1999 4548 0.0 0.0 0.0
2000 4360 0.0 0.0 0.0
2001 3984 0.0 0.0 0.0
2002 3792 0.0 0.0 0.0
2003 3440 0.0 0.0 0.0
2004 986 0.0 0.0 0.0
2005 1680 0.0 0.0 0.0
2006 1920 0.0 0.0 0.0
2007 144 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-07-15 Lost Circulation 191.50 191.50

For data sources see[7]

References