X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524253002000

Well Details

Well ID: 0524253002000
Loading map...
Location: 00/02-30-052-25W4/0
Location Alias: 00/02-30-52-25 W4M
Location Alias 2: 00/02-30-052-25 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 30
County/Municipality: Edmonton
Well Name: LEDDY ACHESON EAST 2-30-52-25
Operator Name: Leddy Exploration Limited
License Number: 0013858
License Date: 1957-08-20
License Status: Abandoned
Spud Date: 1957-08-27
Final Drill Date: 1957-09-24
Well Total Depth: 1740.40 m
Surface Hole Latitude: 53.514118
Surface Hole Longitude: -113.673635

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-08-20 Obtained License
1957-09-06 Drill Stem Test Performed
1957-09-07 Drill Stem Test Performed
1957-09-09 Drill Stem Test Performed
1957-09-15 Drill Stem Test Performed
1957-09-17 Lost Circulation Occurred
1957-09-24 Finished Drilling
1957-09-24 Well Mode changed to Drilled and Cased
1957-09-25 Drill Stem Test Performed
1957-09-26 Perforation Treatment Performed - Bullet Perforation
1957-09-26 Perforation Treatment Performed - Jet Perforation
1957-09-26 Production Casing Operation Performed
1957-09-30 Drill Stem Test Performed
1957-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1957-10-02 Well Began Production
1957-10-02 Well Fluid changed to Crude Oil
1957-10-02 Well Mode changed to Flowing
1957-10-20 Well Fluid changed to Crude Oil
1957-10-20 Well Mode changed to Pumping
1994-09-29 Well Fluid changed to Crude Oil
1994-09-29 Well Mode changed to Suspended
2011-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-25 Perforation Treatment Performed - Jet Perforation
2011-08-26 Perforation Treatment Performed - Cement Squeeze
2011-11-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-09-26 Perforation 1234.40 1234.70 13
1957-09-26 Bullet Perforation 1225.60 1228.30 13
1957-09-26 Bullet Perforation 1230.20 1232.60 26
1957-10-01 Acid Wash 1225.60 1234.70 0
2011-08-24 Packing Device Capped w/Cement 1212.00 1220.00 0
2011-08-25 Perforation 302.00 302.50 17
2011-08-26 Cement Squeeze 302.00 302.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1070 0.0 0.0 0.0
1969 4248 0.0 0.0 0.0
1970 2876 0.0 0.0 0.0
1971 3881 0.0 0.0 0.0
1972 8233 0.0 0.0 0.0
1973 8610 0.0 0.0 0.0
1974 8068 0.0 0.0 0.0
1975 8154 0.0 0.0 0.0
1976 8491 0.0 0.0 0.0
1977 8464 0.0 0.0 0.0
1978 8142 0.0 0.0 0.0
1979 8352 0.0 0.0 0.0
1980 8632 0.0 0.0 0.0
1981 8423 0.0 0.0 0.0
1982 8279 0.0 0.0 0.0
1983 8496 0.0 0.0 0.0
1984 8492 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 7871 0.0 0.0 0.0
1990 8735 0.0 0.0 0.0
1991 8615 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 2232 0.0 0.0 0.0
1994 120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-09-17 Lost Circulation 1458.50 1465.50

For data sources see[6]

References