If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524133306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.531428,"lon":-111.861993,"icon":""}]} |
| Location: 00/06-33-052-13W4/0 | |
| Location Alias: 00/06-33-52-13 W4M | |
| Location Alias 2: 00/06-33-052-13 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 33 | |
| County/Municipality: County of Minburn No. 27 | |
| Well Name: PINE CLIFF PLAIN 6-33-52-13 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0035943 | |
| License Date: 1969-03-04 | |
| License Status: Abandoned | |
| Spud Date: 1969-03-08 | |
| Final Drill Date: 1969-03-11 | |
| Well Total Depth: 752.20 m | |
| Surface Hole Latitude: 53.531428 | |
| Surface Hole Longitude: -111.861993 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-03-04 | Obtained License |
| 1969-03-08 | Blow Occurred |
| 1969-03-08 | Lost Circulation Occurred |
| 1969-03-10 | Drill Stem Test Performed |
| 1969-03-11 | Finished Drilling |
| 1969-03-19 | Production Casing Operation Performed |
| 1969-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1969-06-06 | Perforation Treatment Performed - Jet Perforation |
| 1969-06-07 | Perforation Treatment Performed - Jet Perforation |
| 1969-06-07 | Well Mode changed to Drilled and Cased |
| 1976-02-28 | Well Began Production |
| 1976-02-28 | Well Fluid changed to Gas |
| 1976-02-28 | Well Mode changed to Flowing |
| 1977-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1977-11-03 | Well Fluid changed to Gas |
| 1977-11-03 | Well Mode changed to Abandoned Zone |
| 1994-02-25 | Perforation Treatment Performed - Cement Squeeze |
| 1994-02-28 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-03-07 | Perforation Treatment Performed - Cement Squeeze |
| 1994-03-07 | Plug Back Performed |
| 1994-03-12 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-12 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-13 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-13 | Plug Back Performed |
| 2011-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-03 | Perforation Treatment Performed - Cement Squeeze |
| 2011-02-03 | Plug Back Performed |
| 2011-02-07 | Well Log Performed |
| 2011-02-08 | Well Log Performed |
| 2011-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-12 | Well Log Performed |
| 2011-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-13 | Well Log Performed |
| 2011-02-14 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-14 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-22 | Well Log Performed |
| 2011-03-23 | Perforation Treatment Performed - Remedial Casing |
| 2011-04-04 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-06-06 | Packing Device Capped w/Cement | 720.90 | 720.90 | 0 |
| 1994-03-01 | Acid Treatment | 711.40 | 718.10 | 0 |
| 1994-03-07 | Cement Squeeze | 711.40 | 718.10 | 0 |
| 1994-03-12 | Open Hole/Barefoot Completion | 723.90 | 752.20 | 0 |
| 1994-03-12 | Perforation | 723.90 | 724.80 | 13 |
| 1994-03-16 | Acid Treatment | 723.90 | 724.80 | 0 |
| 1994-07-13 | Packing Device Capped w/Cement | 699.00 | 707.00 | 0 |
| 1994-07-13 | Perforation | 613.30 | 615.10 | 13 |
| 2011-02-01 | Perforation | 620.50 | 622.50 | 17 |
| 2011-02-01 | Perforation | 613.00 | 615.00 | 17 |
| 2011-02-02 | Acid Treatment | 613.00 | 622.50 | 0 |
| 1969-06-06 | Perforation | 716.90 | 718.10 | 13 |
| 2011-02-03 | Cement Squeeze | 613.00 | 622.50 | 0 |
| 2011-02-03 | Packing Device Capped w/Cement | 599.50 | 607.50 | 0 |
| 2011-02-12 | Perforation | 564.00 | 566.00 | 17 |
| 2011-02-13 | Perforation | 549.00 | 551.00 | 17 |
| 2011-02-13 | Acid Treatment | 549.00 | 566.00 | 0 |
| 2011-02-14 | Remedial Casing Cementing | 549.00 | 566.00 | 0 |
| 2011-03-08 | Perforation | 398.00 | 400.00 | 17 |
| 2011-03-13 | Acid Treatment | 398.00 | 400.00 | 0 |
| 2011-03-14 | Remedial Casing Cementing | 398.00 | 400.00 | 0 |
| 2011-03-22 | Perforation | 230.00 | 232.00 | 20 |
| 1969-06-06 | Perforation | 711.40 | 712.60 | 7 |
| 2011-03-23 | Remedial Casing Cementing | 230.00 | 232.00 | 0 |
| 1969-06-07 | Perforation | 613.30 | 615.10 | 13 |
| 1969-06-07 | Perforation | 620.60 | 622.40 | 13 |
| 1977-11-03 | Packing Device Capped w/Cement | 707.10 | 707.10 | 0 |
| 1994-02-25 | Cement Squeeze | 613.30 | 622.40 | 0 |
| 1994-02-28 | Perforation | 711.40 | 712.60 | 7 |
| 1994-02-28 | Perforation | 716.90 | 718.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1976 | 6733 | 0.0 | 0.0 | 0.0 |
| 1977 | 1862 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1969-03-08 | Lost Circulation | 640.10 | 731.20 |
| 1969-03-08 | Blow | 640.10 | 731.20 |
For data sources see[6]