X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524122009000

Well Details

Well ID: 0524122009000
Loading map...
Location: 00/09-20-052-12W4/0
Location Alias: 00/09-20-52-12 W4M
Location Alias 2: 00/09-20-052-12 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 12
Section: 20
County/Municipality: County of Minburn No. 27
Well Name: POCO PLAIN 9-20-52-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0172728
License Date: 1994-11-18
License Status: RecCertified
Spud Date: 1994-11-22
Final Drill Date: 1994-11-25
Well Total Depth: 770.00 m
Surface Hole Latitude: 53.507818
Surface Hole Longitude: -111.727852

For data sources see[1][2]

Well History

Date Event
1994-11-18 Obtained License
1994-11-23 Surface Casing Operation Performed
1994-11-25 Finished Drilling
1994-11-25 Well Log Performed
1994-11-25 Well Mode changed to Drilled and Cased
1994-11-26 Drill Stem Test Performed
1994-11-27 Drill Stem Test Performed
1994-11-28 Production Casing Operation Performed
1994-11-28 Rig Released
1994-12-01 Perforation Treatment Performed - Jet Perforation
1994-12-01 Well Log Performed
1994-12-03 Well Log Performed
1994-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-04 Perforation Treatment Performed - Jet Perforation
1994-12-04 Plug Back Performed
1994-12-04 Well Log Performed
1995-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-08 Perforation Treatment Performed - Fractured
1995-03-06 Well Began Production
1995-03-06 Well Fluid changed to Gas
1995-03-06 Well Mode changed to Flowing
1996-06-01 Well Fluid changed to Gas
1996-06-01 Well Mode changed to Suspended
1996-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-06 Perforation Treatment Performed - Jet Perforation
1996-10-06 Plug Back Performed
1996-10-06 Well Log Performed
1996-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-08 Plug Back Performed
1996-10-08 Well Fluid changed to Gas
1996-10-08 Well Mode changed to Abandoned Zone
1999-11-09 Well Log Performed
1999-11-10 Perforation Treatment Performed - Jet Perforation
1999-11-10 Perforation Treatment Performed - Remedial Casing
1999-11-12 Well Log Performed
1999-11-13 Perforation Treatment Performed - Jet Perforation
1999-11-13 Perforation Treatment Performed - Remedial Casing
1999-11-16 Well Log Performed
1999-11-17 Perforation Treatment Performed - Jet Perforation
1999-11-17 Perforation Treatment Performed - Remedial Casing
2000-08-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-06 Perforation Treatment Performed - Remedial Casing
2000-08-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-08-10 Perforation Treatment Performed - Jet Perforation
2000-08-10 Well Log Performed
2000-08-11 Perforation Treatment Performed - Remedial Casing
2000-08-23 Well Abandoned
2000-08-23 Well Fluid changed to Gas
2000-08-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-01 Perforation 738.00 740.00 13
1999-11-10 Perforation 348.00 348.30 99
1999-11-10 Remedial Casing Cementing 348.00 348.30 0
1999-11-13 Perforation 280.00 280.30 99
1999-11-13 Remedial Casing Cementing 280.00 280.30 0
1999-11-17 Perforation 237.00 237.30 99
1999-11-17 Remedial Casing Cementing 237.00 237.30 0
2000-08-05 Hydra Jet Perforation 575.00 575.50 0
2000-08-05 Acid Treatment 575.00 575.50 0
2000-08-06 Remedial Casing Cementing 575.00 575.50 0
2000-08-10 Perforation 347.50 348.40 99
1994-12-04 Packing Device Capped w/Cement 726.00 734.00 0
2000-08-10 Perforation 348.40 349.50 66
2000-08-10 Hydra Jet Perforation 347.50 349.50 0
2000-08-11 Remedial Casing Cementing 347.50 349.50 0
1994-12-04 Perforation 691.00 693.00 13
1995-01-11 Acid Treatment 691.00 693.00 0
1995-02-08 Fracture 677.00 685.00 0
1996-10-06 Packing Device Capped w/Cement 577.00 685.00 18
1996-10-06 Perforation 612.00 612.50 18
1996-10-06 Perforation 613.00 613.50 18
1996-10-08 Packing Device Capped w/Cement 592.00 600.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1102 0.0 0.0 0.0

For data sources see[5]

References