If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524071410D02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.492918,"lon":-110.922803,"icon":""}]} |
| Location: D0/10-14-052-07W4/2 | |
| Location Alias: D0/10-14-52-07 W4M | |
| Location Alias 2: D0/10-14-052-07 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 07 | |
| Section: 14 | |
| County/Municipality: County of Vermilion River | |
| Well Name: HUSKY SWIMMING 10D-14-52-7 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0076540 | |
| License Date: 1979-06-25 | |
| License Status: RecCertified | |
| Spud Date: 1979-10-13 | |
| Final Drill Date: 1979-10-16 | |
| Well Total Depth: 671.00 m | |
| Surface Hole Latitude: 53.492918 | |
| Surface Hole Longitude: -110.922803 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-06-25 | Obtained License |
| 1979-10-16 | Finished Drilling |
| 1979-10-16 | Well Mode changed to Drilled and Cased |
| 1979-10-17 | Drill Stem Test Performed |
| 1979-10-18 | Drill Stem Test Performed |
| 1979-10-19 | Production Casing Operation Performed |
| 1980-01-25 | Perforation Treatment Performed - Jet Perforation |
| 1980-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-01-28 | Perforation Treatment Performed - Jet Perforation |
| 1981-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1981-11-18 | Perforation Treatment Performed - Jet Perforation |
| 1981-11-20 | Well Began Production |
| 1981-11-20 | Well Fluid changed to Crude Oil |
| 1981-11-20 | Well Mode changed to Pumping |
| 1984-01-16 | Perforation Treatment Performed - Cement Squeeze |
| 1984-01-19 | Perforation Treatment Performed - Jet Perforation |
| 1984-01-19 | Well Fluid changed to Crude Oil |
| 1984-01-19 | Well Mode changed to Abandoned Zone |
| 1984-01-30 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1984-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-11-21 | Plug Back Performed |
| 1984-11-21 | Well Abandoned |
| 1984-11-21 | Well Fluid changed to Crude Oil |
| 1984-11-21 | Well Mode changed to Abandoned |
| 2011-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-06 | Well Log Performed |
| 2011-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-09 | Plug Back Performed |
| 2011-02-10 | Perforation Treatment Performed - Cement Plug |
| 2011-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-10 | Plug Back Performed |
| 2011-02-10 | Well Log Performed |
| 2011-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-14 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-15 | Well Log Performed |
| 2011-02-22 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-24 | Well Log Performed |
| 2011-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-25 | Well Log Performed |
| 2011-03-02 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-08 | Well Log Performed |
| 2011-03-10 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-03-11 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-01-25 | Perforation | 595.60 | 596.80 | 14 |
| 2011-02-04 | Perforation | 561.00 | 562.60 | 13 |
| 2011-02-09 | Packing Device Capped w/Cement | 542.50 | 556.00 | 0 |
| 2011-02-10 | Cement Plug | 526.50 | 542.50 | 0 |
| 2011-02-10 | Perforation | 404.50 | 405.50 | 26 |
| 2011-02-10 | Perforation | 405.00 | 405.90 | 99 |
| 2011-02-14 | Remedial Casing Cementing | 404.50 | 405.90 | 0 |
| 2011-02-14 | Packing Device Capped w/Cement | 380.00 | 399.60 | 0 |
| 2011-02-15 | Perforation | 326.00 | 327.00 | 20 |
| 2011-02-22 | Remedial Casing Cementing | 326.00 | 327.00 | 0 |
| 2011-02-23 | Packing Device Capped w/Cement | 298.30 | 322.00 | 0 |
| 1980-01-28 | Packing Device Capped w/Cement | 593.00 | 593.00 | 0 |
| 2011-02-25 | Perforation | 263.00 | 264.00 | 17 |
| 2011-03-02 | Remedial Casing Cementing | 263.00 | 264.00 | 0 |
| 2011-03-03 | Packing Device Capped w/Cement | 248.50 | 260.00 | 0 |
| 2011-03-08 | Perforation | 169.00 | 170.00 | 17 |
| 2011-03-10 | Remedial Casing Cementing | 169.00 | 170.00 | 0 |
| 2011-03-11 | Packing Device Capped w/Cement | 155.00 | 166.00 | 0 |
| 1980-01-28 | Perforation | 561.00 | 562.60 | 13 |
| 1981-11-18 | Packing Device Capped w/Cement | 549.50 | 557.50 | 0 |
| 1981-11-18 | Perforation | 546.50 | 548.00 | 13 |
| 1984-01-16 | Cement Squeeze | 546.50 | 548.00 | 0 |
| 1984-01-19 | Perforation | 561.00 | 562.60 | 13 |
| 1984-01-30 | Hydra Jet Perforation | 561.00 | 562.50 | 0 |
| 1984-11-21 | Packing Device Capped w/Cement | 544.00 | 544.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 0 | 0.0 | 0.0 | 0.0 |
| 1981 | 576 | 0.0 | 0.0 | 0.0 |
| 1982 | 240 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2011-03-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]