If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524063206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.53287,"lon":-110.85514,"icon":""}]} |
| Location: 00/06-32-052-06W4/0 | |
| Location Alias: 00/06-32-52-06 W4M | |
| Location Alias 2: 00/06-32-052-06 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 32 | |
| County/Municipality: County of Vermilion River | |
| Well Name: HUSKY 6A SWIMMING 6-32-52-6 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0410434 | |
| License Date: 2009-05-08 | |
| License Status: Abandoned | |
| Spud Date: 2009-05-19 | |
| Final Drill Date: 2009-05-21 | |
| Well Total Depth: 650.50 m | |
| Surface Hole Latitude: 53.532870 | |
| Surface Hole Longitude: -110.855140 |
| Date | Event |
|---|---|
| 2009-05-08 | Obtained License |
| 2009-05-19 | Direction Drilling Operation Performed - Deviate |
| 2009-05-20 | Surface Casing Operation Performed |
| 2009-05-21 | Finished Drilling |
| 2009-05-21 | Well Mode changed to Drilled and Cased |
| 2009-05-22 | Production Casing Operation Performed |
| 2009-05-22 | Rig Released |
| 2009-05-22 | Well Log Performed |
| 2009-06-02 | Well Began Production |
| 2009-06-02 | Well Fluid changed to Crude Oil |
| 2009-06-02 | Well Mode changed to Pumping |
| 2009-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-05 | Well Log Performed |
| 2010-01-13 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-13 | Well Fluid changed to Crude Oil |
| 2010-01-13 | Well Mode changed to Suspended |
| 2010-01-14 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2010-01-14 | Well Log Performed |
| 2011-03-18 | Perforation Treatment Performed - Cement Plug |
| 2011-03-18 | Plug Back Performed |
| 2011-03-18 | Well Fluid changed to Crude Oil |
| 2011-03-18 | Well Mode changed to Abandoned Zone |
| 2011-03-21 | Perforation Treatment Performed - Cement Plug |
| 2011-03-21 | Perforation Treatment Performed - Cement Squeeze |
| 2011-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-21 | Plug Back Performed |
| 2011-05-30 | Well Abandoned |
| 2014-01-10 | Well Log Performed |
| 2014-01-22 | Perforation Treatment Performed - Jet Perforation |
| 2014-01-22 | Well Log Performed |
| 2014-01-31 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2014-02-02 | Perforation Treatment Performed - Cement Squeeze |
| 2014-02-02 | Plug Back Performed |
| 2014-02-12 | Well Log Performed |
| 2014-02-18 | Perforation Treatment Performed - Cement Plug |
| 2014-02-18 | Perforation Treatment Performed - Jet Perforation |
| 2014-02-18 | Plug Back Performed |
| 2014-02-18 | Well Log Performed |
| 2014-02-23 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2014-02-24 | Perforation Treatment Performed - Cement Squeeze |
| 2014-02-24 | Plug Back Performed |
| 2014-03-03 | Well Log Performed |
| 2014-03-04 | Plug Back Performed |
| 2014-03-04 | Well Log Performed |
| 2014-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2014-03-06 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2014-03-07 | Perforation Treatment Performed - Cement Squeeze |
| 2014-03-07 | Plug Back Performed |
| 2014-03-10 | Perforation Treatment Performed - Cement Plug |
| 2014-03-10 | Perforation Treatment Performed - Jet Perforation |
| 2014-03-10 | Plug Back Performed |
| 2014-03-10 | Well Log Performed |
| 2014-03-12 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2014-03-13 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2014-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2014-03-14 | Well Log Performed |
| 2014-03-15 | Perforation Treatment Performed - Cement Plug |
| 2014-03-15 | Plug Back Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-05-19 | 30.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-06-05 | Perforation | 595.00 | 599.00 | 26 |
| 2014-02-02 | Cement Squeeze | 483.40 | 495.00 | 0 |
| 2014-02-18 | Perforation | 340.00 | 340.90 | 99 |
| 2014-02-18 | Perforation | 340.00 | 340.90 | 20 |
| 2014-02-18 | Cement Plug | 474.60 | 482.60 | 0 |
| 2014-02-23 | Bridge Plug, No Cement | 337.50 | 338.30 | 0 |
| 2014-02-24 | Cement Squeeze | 338.30 | 343.00 | 0 |
| 2014-03-05 | Perforation | 274.00 | 276.00 | 20 |
| 2014-03-06 | Bridge Plug, No Cement | 271.60 | 272.40 | 0 |
| 2014-03-07 | Cement Squeeze | 272.40 | 276.00 | 0 |
| 2014-03-10 | Cement Plug | 264.00 | 272.00 | 0 |
| 2010-01-13 | Perforation | 618.00 | 621.00 | 26 |
| 2014-03-10 | Perforation | 175.00 | 180.00 | 20 |
| 2014-03-12 | Bridge Plug, No Cement | 171.60 | 172.40 | 0 |
| 2014-03-13 | Bridge Plug, No Cement | 167.70 | 168.40 | 0 |
| 2014-03-14 | Perforation | 162.00 | 164.00 | 20 |
| 2014-03-14 | Perforation | 163.30 | 163.90 | 99 |
| 2014-03-14 | Perforation | 163.00 | 163.30 | 99 |
| 2014-03-15 | Cement Plug | 117.30 | 167.70 | 0 |
| 2010-01-14 | Casing Patch | 595.00 | 599.00 | 0 |
| 2011-03-18 | Cement Plug | 550.87 | 636.00 | 0 |
| 2011-03-21 | Perforation | 341.50 | 342.50 | 20 |
| 2011-03-21 | Cement Squeeze | 341.50 | 342.50 | 0 |
| 2011-03-21 | Cement Plug | 287.50 | 357.50 | 0 |
| 2014-01-22 | Perforation | 491.00 | 495.00 | 20 |
| 2014-01-31 | Bridge Plug, No Cement | 482.60 | 483.40 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 456 | 0.0 | 0.0 | 0.0 |
| 2010 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]