If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524061503000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/03-15-052-06W4/0 | |
| Location Alias: 00/03-15-52-06 W4M | |
| Location Alias 2: 00/03-15-052-06 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 15 | |
| County/Municipality: County of Vermilion River | |
| Well Name: HOME ET AL SWIMMING 3-15-52-6 | |
| Operator Name: Devon Canada Corporation | |
| License Number: 0100771 | |
| License Date: 1983-02-25 | |
| License Status: RecCertified | |
| Spud Date: 1983-02-28 | |
| Final Drill Date: 1983-03-02 | |
| Well Total Depth: 658.00 m | |
| Surface Hole Latitude: 53.483527 | |
| Surface Hole Longitude: -110.809773 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-02-25 | Obtained License |
| 1983-03-02 | Finished Drilling |
| 1983-03-02 | Lost Circulation Occurred |
| 1983-03-03 | Drill Stem Test Performed |
| 1983-03-04 | Production Casing Operation Performed |
| 1983-03-08 | Perforation Treatment Performed - Jet Perforation |
| 1983-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1983-03-10 | Perforation Treatment Performed - Jet Perforation |
| 1983-07-05 | Well Mode changed to Drilled and Cased |
| 1985-11-01 | Well Began Production |
| 1985-11-01 | Well Fluid changed to Gas |
| 1985-11-01 | Well Mode changed to Flowing |
| 1987-03-31 | Well Fluid changed to Gas |
| 1987-03-31 | Well Mode changed to Suspended |
| 1993-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-12-01 | Plug Back Performed |
| 1993-12-01 | Well Fluid changed to Gas |
| 1993-12-01 | Well Mode changed to Abandoned Zone |
| 1993-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-12-02 | Perforation Treatment Performed - Jet Perforation |
| 1993-12-02 | Plug Back Performed |
| 1993-12-02 | Well Log Performed |
| 1993-12-03 | Perforation Treatment Performed - Remedial Casing |
| 1995-09-18 | Well Log Performed |
| 1998-11-22 | Well Log Performed |
| 1998-11-23 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-23 | Perforation Treatment Performed - Remedial Casing |
| 1998-12-01 | Perforation Treatment Performed - Jet Perforation |
| 1998-12-02 | Well Log Performed |
| 1998-12-04 | Well Log Performed |
| 1998-12-05 | Well Log Performed |
| 1998-12-06 | Perforation Treatment Performed - Jet Perforation |
| 1998-12-07 | Well Log Performed |
| 1998-12-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-12-08 | Perforation Treatment Performed - Remedial Casing |
| 1998-12-08 | Plug Back Performed |
| 1998-12-10 | Well Log Performed |
| 1998-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-12-11 | Perforation Treatment Performed - Remedial Casing |
| 1998-12-11 | Plug Back Performed |
| 1999-08-22 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-03-08 | Perforation | 612.00 | 615.00 | 13 |
| 1993-12-02 | Perforation | 267.00 | 267.30 | 13 |
| 1993-12-03 | Remedial Casing Cementing | 267.00 | 267.30 | 0 |
| 1998-11-23 | Perforation | 150.00 | 151.00 | 13 |
| 1998-11-23 | Remedial Casing Cementing | 150.00 | 151.00 | 0 |
| 1998-12-01 | Perforation | 267.00 | 267.30 | 13 |
| 1998-12-06 | Perforation | 339.00 | 340.00 | 13 |
| 1998-12-08 | Acid Treatment | 339.00 | 340.00 | 0 |
| 1998-12-08 | Remedial Casing Cementing | 339.00 | 340.00 | 0 |
| 1998-12-08 | Packing Device Capped w/Cement | 313.40 | 337.00 | 0 |
| 1998-12-11 | Remedial Casing Cementing | 267.00 | 267.30 | 0 |
| 1983-03-09 | Perforation | 612.00 | 615.00 | 13 |
| 1998-12-11 | Packing Device Capped w/Cement | 221.20 | 250.00 | 0 |
| 1983-03-09 | Perforation | 497.00 | 500.00 | 13 |
| 1983-03-10 | Perforation | 453.00 | 455.00 | 13 |
| 1983-03-10 | Perforation | 426.50 | 429.00 | 13 |
| 1993-12-01 | Packing Device Capped w/Cement | 589.00 | 597.00 | 0 |
| 1993-12-01 | Packing Device Capped w/Cement | 474.00 | 482.00 | 0 |
| 1993-12-01 | Packing Device Capped w/Cement | 437.00 | 445.00 | 0 |
| 1993-12-02 | Packing Device Capped w/Cement | 412.00 | 420.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 720 | 0.0 | 0.0 | 0.0 |
| 1986 | 2206 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1983-03-02 | Lost Circulation | 655.00 | 658.00 |
For data sources see[6]