If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524041111AA0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.477042,"lon":-110.488091,"icon":""}]} |
| Location: AA/11-11-052-04W4/0 | |
| Location Alias: AA/11-11-52-04 W4M | |
| Location Alias 2: AA/11-11-052-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 11 | |
| County/Municipality: County of Vermilion River | |
| Well Name: CDNOXY PI-1 EX MORGAN 11-11-52-4 | |
| Operator Name: CNOOC Petroleum North America ULC | |
| License Number: 0053734 | |
| License Date: 1975-06-03 | |
| License Status: RecCertified | |
| Spud Date: 1975-06-14 | |
| Final Drill Date: 1975-06-18 | |
| Well Total Depth: 609.60 m | |
| Surface Hole Latitude: 53.477042 | |
| Surface Hole Longitude: -110.488091 |
| Date | Event |
|---|---|
| 1975-06-03 | Obtained License |
| 1975-06-18 | Finished Drilling |
| 1975-06-18 | Well Mode changed to Drilled and Cased |
| 1975-06-19 | Production Casing Operation Performed |
| 1975-07-01 | Well Began Production |
| 1975-07-01 | Well Fluid changed to Crude Oil |
| 1975-07-01 | Well Type changed to Cyclical |
| 1975-07-02 | Perforation Treatment Performed - Jet Perforation |
| 1976-04-30 | Well Fluid changed to Crude Oil |
| 1976-04-30 | Well Mode changed to Suspended |
| 1976-04-30 | Well Type changed to Cyclical |
| 1986-01-28 | Well Log Performed |
| 1987-11-23 | Perforation Treatment Performed - Cement Squeeze |
| 1987-11-23 | Plug Back Performed |
| 1988-05-10 | Well Abandoned |
| 1988-05-10 | Well Fluid changed to Crude Oil |
| 1988-05-10 | Well Mode changed to Abandoned |
| 1988-05-10 | Well Type changed to Cyclical |
| 1998-09-05 | Perforation Treatment Performed - Jet Perforation |
| 1998-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-09-07 | Perforation Treatment Performed - Remedial Casing |
| 1998-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-07-02 | Perforation | 567.50 | 574.20 | 13 |
| 1987-11-23 | Cement Squeeze | 567.50 | 574.20 | 0 |
| 1998-09-05 | Perforation | 193.50 | 193.80 | 72 |
| 1998-09-06 | Acid Treatment | 193.50 | 193.80 | 0 |
| 1998-09-07 | Remedial Casing Cementing | 193.50 | 193.80 | 0 |
| 1998-09-08 | Packing Device Capped w/Cement | 180.70 | 188.70 | 0 |
| 1998-09-10 | Packing Device Capped w/Cement | 127.00 | 135.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1975 | 2304 | 0.0 | 0.0 | 0.0 |
| 1976 | 2040 | 0.0 | 0.0 | 0.0 |
For data sources see[5]