X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515250408000

Well Details

Well ID: 0515250408000
Loading map...
Location: 00/08-04-051-25W5/0
Location Alias: 00/08-04-51-25 W5M
Location Alias 2: 00/08-04-051-25 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 25
Section: 04
County/Municipality: Hinton
Well Name: TOURMALINE HINTON 8-4-51-25
Operator Name: Tourmaline Oil Corp.
License Number: 0377799
License Date: 2007-06-05
License Status: Issued
Spud Date: 2008-04-18
Final Drill Date: 2008-05-27
Well Total Depth: 3426.00 m
Surface Hole Latitude: 53.368249
Surface Hole Longitude: -117.620991

For data sources see[1][2]

Well History

Date Event
2007-06-05 Obtained License
2008-04-19 Direction Drilling Operation Performed - Deviate
2008-04-22 Surface Casing Operation Performed
2008-05-10 Well Log Performed
2008-05-11 Intermediate Casing Operation Performed
2008-05-27 Finished Drilling
2008-05-27 Well Log Performed
2008-05-27 Well Mode changed to Drilled and Cased
2008-06-01 Production Casing Operation Performed
2008-06-04 Rig Released
2008-10-16 Perforation Treatment Performed - Jet Perforation
2008-10-18 Perforation Treatment Performed - Fractured
2008-10-21 Perforation Treatment Performed - Jet Perforation
2008-10-24 Perforation Treatment Performed - Fractured
2008-11-02 Perforation Treatment Performed - Jet Perforation
2008-11-04 Perforation Treatment Performed - Fractured
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2010-10-01 Well Fluid changed to Gas
2010-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-04-19 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-16 Perforation 3302.50 3397.50 1
2008-10-18 Fracture 3302.50 3397.50 0
2008-10-21 Perforation 3048.00 3104.60 1
2008-10-24 Fracture 3048.00 3104.60 0
2008-11-02 Perforation 2467.00 2477.50 20
2008-11-04 Fracture 2467.00 2477.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6600 0.0 0.0 0.0
2010 8636 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8712 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 8303 0.0 0.0 0.0
2016 8742 0.0 0.0 0.0
2017 8410 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8330 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References