X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515240804000

Well Details

Well ID: 0515240804000
Loading map...
Location: 00/04-08-051-24W5/0
Location Alias: 00/04-08-51-24 W5M
Location Alias 2: 00/04-08-051-24 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 24
Section: 08
County/Municipality: Yellowhead County
Well Name: TOURMALINE ANDERSN 4-8-51-24
Operator Name: Tourmaline Oil Corp.
License Number: 0181204
License Date: 1995-10-05
License Status: Suspension
Spud Date: 1995-10-17
Final Drill Date: 1995-11-23
Well Total Depth: 2587.00 m
Surface Hole Latitude: 53.385510
Surface Hole Longitude: -117.507715

For data sources see[1][2]

Well History

Date Event
1995-10-05 Obtained License
1995-10-22 Surface Casing Operation Performed
1995-11-03 Direction Drilling Operation Performed - Deviate
1995-11-11 Kick Occurred
1995-11-13 Lost Circulation Occurred
1995-11-17 Well Log Performed
1995-11-19 Lost Circulation Occurred
1995-11-19 Production Casing Operation Performed
1995-11-23 Finished Drilling
1995-11-23 Well Log Performed
1995-11-25 Perforation Treatment Performed - Open-Hole Completion
1995-11-25 Rig Released
1995-11-25 Well Mode changed to Drilled and Cased
1995-11-28 Well Log Performed
1999-07-20 Well Log Performed
1999-07-21 Well Log Performed
1999-08-17 Liner Casing Operation Performed
1999-08-17 Perforation Treatment Performed - Cement Squeeze
1999-08-22 Perforation Treatment Performed - Jet Perforation
1999-08-24 Perforation Treatment Performed - Fractured
1999-11-05 Well Began Production
1999-11-05 Well Fluid changed to Gas
1999-11-05 Well Mode changed to Flowing
2015-10-31 Well Fluid changed to Gas
2015-10-31 Well Mode changed to Suspended
2018-07-02 Well Log Performed
2018-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-03 Perforation Treatment Performed - Cement Squeeze
2018-07-05 Well Log Performed
2018-07-06 Well Log Performed
2018-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-07 Perforation Treatment Performed - Jet Perforation
2018-07-07 Well Log Performed
2018-07-08 Perforation Treatment Performed - Cement Squeeze
2018-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-10 Plug Back Performed
2018-07-10 Well Fluid changed to Gas
2018-07-10 Well Mode changed to Abandoned Zone
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-19 Perforation Treatment Performed - Cement Squeeze
2019-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-20 Perforation Treatment Performed - Cement Squeeze
2019-02-20 Perforation Treatment Performed - Jet Perforation
2019-02-20 Well Log Performed
2019-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-22 Perforation Treatment Performed - Cement Squeeze
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-03 1697.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-25 Open Hole/Barefoot Completion 2542.00 2587.00 0
2018-07-08 Cement Squeeze 2483.50 2485.50 0
2018-07-10 Packing Device Capped w/Cement 2417.00 2425.00 0
2019-02-18 Perforation 1009.00 1010.00 20
2019-02-19 Cement Squeeze 1009.00 1010.00 0
2019-02-19 Packing Device Capped w/Cement 986.50 1006.50 0
2019-02-20 Perforation 870.00 871.00 20
2019-02-20 Cement Squeeze 870.00 871.00 0
2019-02-20 Packing Device Capped w/Cement 846.00 864.00 0
2019-02-22 Perforation 545.00 546.00 17
2019-02-22 Cement Squeeze 545.00 546.00 0
1999-08-17 Cement Squeeze 2542.00 2587.00 0
2019-02-22 Packing Device Capped w/Cement 520.00 538.00 0
1999-08-22 Perforation 2543.00 2555.00 20
1999-08-24 Fracture 2543.00 2555.00 0
2018-07-03 Cement Squeeze 2543.00 2555.00 0
2018-07-03 Packing Device Capped w/Cement 2528.00 2538.00 0
2018-07-07 Perforation 2483.50 2485.50 17
2018-07-07 Perforation 2483.50 2485.50 20
2018-07-07 Packing Device Capped w/Cement 2471.50 2481.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1338 0.0 0.0 0.0
2000 3999 0.0 0.0 0.0
2001 2189 0.0 0.0 0.0
2004 2917 0.0 0.0 0.0
2005 8663 0.0 0.0 0.0
2006 8596 0.0 0.0 0.0
2007 8591 0.0 0.0 0.0
2008 7536 0.0 0.0 0.0
2009 2904 0.0 0.0 0.0
2010 3984 0.0 0.0 0.0
2011 4008 0.0 0.0 0.0
2012 1741 0.0 0.0 0.0
2013 283 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-11-11 Kick 2544.50 2544.50
1995-11-13 Lost Circulation 2544.50 2544.50
1995-11-19 Lost Circulation 2544.50 2544.50
2018-07-07 No Incident Encountered 0.00 0.00
2018-07-10 No Incident Encountered 0.00 0.00
2019-02-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References