X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515231102000

Well Details

Well ID: 0515231102000
Loading map...
Location: 00/02-11-051-23W5/0
Location Alias: 00/02-11-51-23 W5M
Location Alias 2: 00/02-11-051-23 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 23
Section: 11
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ ANDERSN 2-11-51-23
Operator Name: Tourmaline Oil Corp.
License Number: 0485069
License Date: 2017-08-18
License Status: Amended
Spud Date: 2018-02-23
Final Drill Date: 2018-03-25
Well Total Depth: 4039.00 m
Surface Hole Latitude: 53.372665
Surface Hole Longitude: -117.258903

For data sources see[1][2]

Well History

Date Event
2017-08-18 Obtained License
2018-02-24 Surface Casing Operation Performed
2018-03-16 Direction Drilling Operation Performed - Deviate
2018-03-18 Intermediate Casing Operation Performed
2018-03-19 Direction Drilling Operation Performed - Horizontal
2018-03-19 Well Log Performed
2018-03-25 Finished Drilling
2018-03-25 Well Log Performed
2018-03-25 Well Mode changed to Drilled and Cased
2018-03-26 Liner Casing Operation Performed
2018-03-27 Rig Released
2018-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-05 Well Began Production
2018-06-05 Well Fluid changed to Gas
2018-06-05 Well Mode changed to Pumping
2018-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-07 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-03-16 2168.00 Deviate (5 - 79 degrees)
2018-03-19 2595.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-05 Multi-Stage Fracture 3973.30 3973.40 0
2018-06-06 Multi-Stage Fracture 3533.40 3533.50 0
2018-06-06 Multi-Stage Fracture 3480.40 3480.50 0
2018-06-06 Multi-Stage Fracture 3427.40 3427.50 0
2018-06-06 Multi-Stage Fracture 3374.40 3374.50 0
2018-06-06 Multi-Stage Fracture 3321.80 3321.90 0
2018-06-07 Multi-Stage Fracture 3268.90 3269.00 0
2018-06-07 Multi-Stage Fracture 3215.90 3216.00 0
2018-06-07 Multi-Stage Fracture 3162.90 3163.00 0
2018-06-07 Multi-Stage Fracture 3110.00 3110.10 0
2018-06-07 Multi-Stage Fracture 3057.10 3057.20 0
2018-06-06 Multi-Stage Fracture 3944.10 3944.20 0
2018-06-07 Multi-Stage Fracture 3004.00 3004.10 0
2018-06-07 Multi-Stage Fracture 2951.00 2951.10 0
2018-06-07 Multi-Stage Fracture 2898.10 2898.20 0
2018-06-07 Multi-Stage Fracture 2845.10 2845.20 0
2018-06-07 Multi-Stage Fracture 2792.20 2792.30 0
2018-06-07 Multi-Stage Fracture 2739.20 2739.30 0
2018-06-07 Multi-Stage Fracture 2686.60 2686.70 0
2018-06-07 Multi-Stage Fracture 2633.70 2633.80 0
2018-06-07 Multi-Stage Fracture 2580.70 2580.80 0
2018-06-06 Multi-Stage Fracture 3904.00 3904.10 0
2018-06-06 Multi-Stage Fracture 3851.00 3851.10 0
2018-06-06 Multi-Stage Fracture 3798.00 3798.10 0
2018-06-06 Multi-Stage Fracture 3745.30 3745.40 0
2018-06-06 Multi-Stage Fracture 3692.30 3692.40 0
2018-06-06 Multi-Stage Fracture 3639.40 3639.50 0
2018-06-06 Multi-Stage Fracture 3586.40 3586.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-05 2018-06-07 2,481 6,805 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.1701 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.603 N/A
silica crystalline 14808-60-7 100 3.6029 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.3343 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7048 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
polyethylene glycol 25322-68-3 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0899 N/A
water Not Available 100 0.0899 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0467 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0467 N/A
non-hazardous ingredients Not Available 100 0.0467 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.041 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.041 N/A
methanol 67-56-1 100 0.041 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.041 N/A
non-hazardous ingredients Not Available 100 0.041 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-06 2018-06-06 Recycled Fracturing Water (treated at well site) 968
2018-06-03 2018-06-07 Groundwater - Non-saline less than or equal to 150m deep 5837

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4902 0.0 0.0 0.0
2019 8465 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-25 No Incident Encountered 0.00 0.00
2018-06-19 No Incident Encountered 0.00 0.00

For data sources see[9]

References