X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515190615020

Well Details

Well ID: 0515190615020
Loading map...
Location: 02/15-06-051-19W5/0
Location Alias: 02/15-06-51-19 W5M
Location Alias 2: 02/15-06-051-19 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 19
Section: 06
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ102 ANSELL 15-6-51-19
Operator Name: Tourmaline Oil Corp.
License Number: 0495247
License Date: 2019-07-25
License Status: Amended
Spud Date: 2019-10-09
Final Drill Date: 2019-10-31
Well Total Depth: 4399.00 m
Surface Hole Latitude: 53.366195
Surface Hole Longitude: -116.777916

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-09 Nabors Drilling Canada Limited C34 Set Surface
2019-10-27 Nabors Drilling Canada Limited C034 Resumption

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-10-09 195.20 Deviate (5 - 79 degrees)
2019-10-29 3076.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-30 Multi-Stage Fracture 4338.70 4338.80 0
2019-12-01 Multi-Stage Fracture 3877.30 3877.40 0
2019-12-01 Multi-Stage Fracture 3824.70 3824.80 0
2019-12-01 Multi-Stage Fracture 3772.10 3772.20 0
2019-12-01 Multi-Stage Fracture 3719.50 3719.60 0
2019-12-01 Multi-Stage Fracture 3666.90 3667.00 0
2019-12-01 Multi-Stage Fracture 3614.50 3614.60 0
2019-12-01 Multi-Stage Fracture 3562.60 3562.70 0
2019-12-01 Multi-Stage Fracture 3510.10 3510.20 0
2019-12-01 Multi-Stage Fracture 3457.60 3457.70 0
2019-12-01 Multi-Stage Fracture 3405.00 3405.10 0
2019-11-30 Multi-Stage Fracture 4297.30 4297.40 0
2019-12-01 Multi-Stage Fracture 3352.70 3352.80 0
2019-12-01 Multi-Stage Fracture 3300.20 3300.30 0
2019-12-01 Multi-Stage Fracture 3260.30 3260.40 0
2019-12-01 Multi-Stage Fracture 3220.30 3220.40 0
2019-12-01 Multi-Stage Fracture 3180.50 3180.60 0
2019-11-30 Multi-Stage Fracture 4245.00 4245.10 0
2019-11-30 Multi-Stage Fracture 4192.40 4192.50 0
2019-11-30 Multi-Stage Fracture 4139.80 4139.90 0
2019-11-30 Multi-Stage Fracture 4087.20 4087.30 0
2019-11-30 Multi-Stage Fracture 4034.60 4034.70 0
2019-11-30 Multi-Stage Fracture 3982.10 3982.20 0
2019-11-30 Multi-Stage Fracture 3929.90 3930.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-30 2019-12-01 2,934 5,054 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.8776 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.0054 N/A
silica crystalline 14808-60-7 100 4.0054 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.9275 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 2.0027 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0115 N/A
dibromoacetonitrile 3252-43-5 100 0.0115 N/A
non-hazardous ingredients Not Available 100 0.0115 N/A
polyethylene glycol 25322-68-3 100 0.0115 N/A
sodium bromide 7647-15-6 100 0.0115 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.09 N/A
water Not Available 100 0.09 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0437 N/A
non-hazardous ingredients Not Available 100 0.0437 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0412 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0412 N/A
methanol 67-56-1 100 0.0412 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0412 N/A
non-hazardous ingredients Not Available 100 0.0412 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-11-29 2019-12-01 Recycled Fracturing Water (treated at well site) 1507
2019-11-29 2019-12-02 Surface Water - River 3547

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 567 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-31 No Incident Encountered 0.00 0.00
2019-12-11 No Incident Encountered 0.00 0.00

For data sources see[9]

References