X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515190114020

Well Details

Well ID: 0515190114020
Loading map...
Location: 02/14-01-051-19W5/0
Location Alias: 02/14-01-51-19 W5M
Location Alias 2: 02/14-01-051-19 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 19
Section: 01
County/Municipality: Yellowhead County
Well Name: TOURMALINE 102HZ ANSELL 14-1-51-19
Operator Name: Tourmaline Oil Corp.
License Number: 0487668
License Date: 2018-01-16
License Status: Issued
Spud Date: 2018-02-22
Final Drill Date: 2018-05-08
Well Total Depth: 4368.00 m
Surface Hole Latitude: 53.365100
Surface Hole Longitude: -116.676528

For data sources see[1][2]

Well History

Date Event
2018-01-16 Obtained License
2018-02-22 Direction Drilling Operation Performed - Deviate
2018-02-23 Surface Casing Operation Performed
2018-04-30 Well Log Performed
2018-05-02 Intermediate Casing Operation Performed
2018-05-03 Direction Drilling Operation Performed - Horizontal
2018-05-08 Finished Drilling
2018-05-08 Well Log Performed
2018-05-08 Well Mode changed to Drilled and Cased
2018-05-09 Liner Casing Operation Performed
2018-05-09 Rig Released
2018-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-12 Well Began Production
2018-06-12 Well Fluid changed to Gas
2018-06-12 Well Mode changed to Flowing
2019-01-03 Well Fluid changed to Gas
2019-01-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-05-03 Nabors Drilling Canada Limited 34 N/A Resumption
2018-02-22 Nabors Drilling Canada Limited 34 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-22 122.00 Deviate (5 - 79 degrees)
2018-05-03 2978.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-09 Multi-Stage Fracture 4305.00 4305.10 0
2018-06-09 Multi-Stage Fracture 3827.00 3827.10 0
2018-06-09 Multi-Stage Fracture 3774.10 3774.20 0
2018-06-10 Multi-Stage Fracture 3721.20 3721.30 0
2018-06-10 Multi-Stage Fracture 3668.70 3668.80 0
2018-06-10 Multi-Stage Fracture 3615.80 3615.90 0
2018-06-10 Multi-Stage Fracture 3562.90 3563.00 0
2018-06-10 Multi-Stage Fracture 3510.00 3510.10 0
2018-06-10 Multi-Stage Fracture 3457.10 3457.20 0
2018-06-10 Multi-Stage Fracture 3404.20 3404.30 0
2018-06-10 Multi-Stage Fracture 3351.30 3351.40 0
2018-06-09 Multi-Stage Fracture 4250.10 4250.20 0
2018-06-10 Multi-Stage Fracture 3298.40 3298.50 0
2018-06-10 Multi-Stage Fracture 3245.60 3245.70 0
2018-06-10 Multi-Stage Fracture 3192.70 3192.80 0
2018-06-10 Multi-Stage Fracture 3140.10 3140.20 0
2018-06-10 Multi-Stage Fracture 3087.20 3087.30 0
2018-06-10 Multi-Stage Fracture 3034.60 3034.70 0
2018-06-09 Multi-Stage Fracture 4197.20 4197.30 0
2018-06-09 Multi-Stage Fracture 4144.30 4144.40 0
2018-06-09 Multi-Stage Fracture 4091.40 4091.50 0
2018-06-09 Multi-Stage Fracture 4038.50 4038.60 0
2018-06-09 Multi-Stage Fracture 3985.50 3985.60 0
2018-06-09 Multi-Stage Fracture 3932.60 3932.70 0
2018-06-09 Multi-Stage Fracture 3879.90 3880.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-09 2018-06-10 2,823 5,825 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.6317 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.8051 N/A
silica crystalline 14808-60-7 100 3.8051 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.4797 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8829 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.014 N/A
dibromoacetonitrile 3252-43-5 100 0.014 N/A
non-hazardous ingredients Not Available 100 0.014 N/A
polyethylene glycol 25322-68-3 100 0.014 N/A
sodium bromide 7647-15-6 100 0.014 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0925 N/A
water Not Available 100 0.0925 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.05 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.05 N/A
non-hazardous ingredients Not Available 100 0.05 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0438 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0438 N/A
methanol 67-56-1 100 0.0438 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0438 N/A
non-hazardous ingredients Not Available 100 0.0438 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-09 2018-06-10 Recycled Fracturing Water (treated at well site) 4975
2018-06-06 2018-06-12 Surface Water - River 851

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4687 0.0 0.0 0.0
2019 8754 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-08 No Incident Encountered 0.00 0.00
2018-06-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References