X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515190114000

Well Details

Well ID: 0515190114000
Loading map...
Location: 00/14-01-051-19W5/0
Location Alias: 00/14-01-51-19 W5M
Location Alias 2: 00/14-01-051-19 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 19
Section: 01
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ ANSELL 14-1-51-19
Operator Name: Tourmaline Oil Corp.
License Number: 0479007
License Date: 2016-02-04
License Status: Issued
Spud Date: 2016-05-29
Final Drill Date: 2016-07-03
Well Total Depth: 4337.00 m
Surface Hole Latitude: 53.366942
Surface Hole Longitude: -116.659533

For data sources see[1][2]

Well History

Date Event
2016-02-04 Obtained License
2016-05-29 Direction Drilling Operation Performed - Deviate
2016-05-30 Surface Casing Operation Performed
2016-06-29 Well Log Performed
2016-06-30 Intermediate Casing Operation Performed
2016-07-01 Direction Drilling Operation Performed - Horizontal
2016-07-03 Finished Drilling
2016-07-03 Well Log Performed
2016-07-03 Well Mode changed to Drilled and Cased
2016-07-04 Liner Casing Operation Performed
2016-07-04 Well Log Performed
2016-07-06 Rig Released
2016-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-04 Well Began Production
2016-08-04 Well Fluid changed to Gas
2016-08-04 Well Mode changed to Flowing
2018-12-10 Well Fluid changed to Gas
2018-12-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-06-24 Patterson-UTI Drilling Co. Canada 16E N/A Resumption
2016-05-29 Patterson-UTI Drilling Co. Canada 16E N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-05-29 211.30 Deviate (5 - 79 degrees)
2016-07-01 3114.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-29 Multi-Stage Fracture 4281.00 4281.10 0
2016-08-02 Multi-Stage Fracture 3898.50 3898.60 0
2016-08-02 Multi-Stage Fracture 3856.10 3856.20 0
2016-08-02 Multi-Stage Fracture 3813.70 3813.80 0
2016-08-02 Multi-Stage Fracture 3771.30 3771.40 0
2016-08-03 Multi-Stage Fracture 3728.90 3729.00 0
2016-08-03 Multi-Stage Fracture 3686.50 3686.60 0
2016-08-03 Multi-Stage Fracture 3644.10 3644.20 0
2016-08-03 Multi-Stage Fracture 3601.70 3601.80 0
2016-08-03 Multi-Stage Fracture 3559.50 3559.60 0
2016-08-03 Multi-Stage Fracture 3517.10 3517.20 0
2016-08-02 Multi-Stage Fracture 4237.20 4237.30 0
2016-08-03 Multi-Stage Fracture 3461.30 3461.40 0
2016-08-03 Multi-Stage Fracture 3405.50 3405.60 0
2016-08-03 Multi-Stage Fracture 3349.70 3349.80 0
2016-08-03 Multi-Stage Fracture 3293.90 3294.00 0
2016-08-03 Multi-Stage Fracture 3238.10 3238.20 0
2016-08-03 Multi-Stage Fracture 3182.30 3182.40 0
2016-08-03 Multi-Stage Fracture 3126.70 3126.80 0
2016-08-02 Multi-Stage Fracture 4194.80 4194.90 0
2016-08-02 Multi-Stage Fracture 4152.40 4152.50 0
2016-08-02 Multi-Stage Fracture 4110.20 4110.30 0
2016-08-02 Multi-Stage Fracture 4067.80 4067.90 0
2016-08-02 Multi-Stage Fracture 4025.40 4025.50 0
2016-08-02 Multi-Stage Fracture 3983.30 3983.40 0
2016-08-02 Multi-Stage Fracture 3940.90 3941.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-29 2016-08-03 2,840 6,272 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.8612 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.3601 N/A
silica crystalline 14808-60-7 100 3.3601 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.3699 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7741 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
2-mercaptoethanol 60-24-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0912 N/A
water Not Available 100 0.0912 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0882 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0882 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0882 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0882 N/A
non-hazardous ingredients Not Available 100 0.0882 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0407 N/A
methanol 67-56-1 100 0.0407 N/A
water Not Available 100 0.0407 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-01 2016-08-03 Surface Water - River 6272

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3401 0.0 0.0 0.0
2017 8530 0.0 0.0 0.0
2018 8359 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-03 No Incident Encountered 0.00 0.00
2016-08-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References