X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515182903002

Well Details

Well ID: 0515182903002
Loading map...
Location: 00/03-29-051-18W5/2
Location Alias: 00/03-29-51-18 W5M
Location Alias 2: 00/03-29-051-18 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 29
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 3-29-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0474431
License Date: 2015-01-28
License Status: Amended
Spud Date: 2015-09-26
Final Drill Date: 2015-10-26
Well Total Depth: 4317.00 m
Surface Hole Latitude: 53.440233
Surface Hole Longitude: -116.635940

For data sources see[1][2]

Well History

Date Event
2015-01-28 Obtained License
2015-10-01 Direction Drilling Operation Performed - Deviate
2015-10-09 Direction Drilling Operation Performed - Horizontal
2015-10-21 Direction Drilling Operation Performed - Horizontal
2015-10-21 Direction Drilling Operation Performed - Sidetrack Fish
2015-10-26 Finished Drilling
2015-10-26 Well Log Performed
2015-10-26 Well Mode changed to Drilled and Cased
2015-10-29 Liner Casing Operation Performed
2015-10-29 Rig Released
2015-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-27 Well Fluid changed to Gas
2015-11-27 Well Mode changed to Testing
2015-12-12 Well Began Production
2015-12-12 Well Fluid changed to Gas
2015-12-12 Well Mode changed to Flowing
2019-02-28 Well Fluid changed to Gas
2019-02-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-10-01 2452.00 Deviate (5 - 79 degrees)
2015-10-09 2974.40 Horizontal
2015-10-21 3003.30 Sidetrack fish
2015-10-21 3003.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-18 Multi-Stage Fracture 4238.30 4238.40 0
2015-11-22 Multi-Stage Fracture 3775.90 3776.00 0
2015-11-22 Multi-Stage Fracture 3723.30 3723.40 0
2015-11-22 Multi-Stage Fracture 3670.80 3670.90 0
2015-11-22 Multi-Stage Fracture 3618.20 3618.30 0
2015-11-22 Multi-Stage Fracture 3566.00 3566.10 0
2015-11-22 Multi-Stage Fracture 3513.30 3513.40 0
2015-11-22 Multi-Stage Fracture 3460.60 3460.70 0
2015-11-22 Multi-Stage Fracture 3407.90 3408.00 0
2015-11-22 Multi-Stage Fracture 3355.10 3355.20 0
2015-11-22 Multi-Stage Fracture 3302.40 3302.50 0
2015-11-21 Multi-Stage Fracture 4196.80 4196.90 0
2015-11-22 Multi-Stage Fracture 3249.60 3249.70 0
2015-11-22 Multi-Stage Fracture 3196.80 3196.90 0
2015-11-22 Multi-Stage Fracture 3144.10 3144.20 0
2015-11-22 Multi-Stage Fracture 3091.30 3091.40 0
2015-11-22 Multi-Stage Fracture 3038.50 3038.60 0
2015-11-22 Multi-Stage Fracture 2973.10 2973.20 0
2015-11-22 Multi-Stage Fracture 2920.30 2920.40 0
2015-11-21 Multi-Stage Fracture 4144.20 4144.30 0
2015-11-21 Multi-Stage Fracture 4091.70 4091.80 0
2015-11-21 Multi-Stage Fracture 4039.00 4039.10 0
2015-11-21 Multi-Stage Fracture 3986.50 3986.60 0
2015-11-22 Multi-Stage Fracture 3933.90 3934.00 0
2015-11-22 Multi-Stage Fracture 3881.10 3881.20 0
2015-11-22 Multi-Stage Fracture 3828.50 3828.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-18 2015-11-22 2,774 5,665 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.1865 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.4879 N/A
silica crystalline 14808-60-7 100 4.4879 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.0732 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.9384 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
polyethylene glycol 25322-68-3 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1502 N/A
water Not Available 100 0.1502 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0854 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0854 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0854 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0854 N/A
non-hazardous ingredients Not Available 100 0.0854 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0678 N/A
isopropanol 67-63-0 100 0.0678 N/A
methanol 67-56-1 100 0.0677 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0678 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0678 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-18 2015-11-18 Recycled Fracturing Water (treated at well site) 446
2015-11-20 2015-11-23 Recycled Fracturing Water (treated at well site) 1457
2015-11-20 2015-11-23 Groundwater - Non-saline less than or equal to 150m deep 3762

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 686 0.0 0.0 0.0
2016 8640 0.0 0.0 0.0
2017 2688 0.0 0.0 0.0
2018 7934 0.0 0.0 0.0
2019 8545 0.0 0.0 0.0
2020 2024 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-29 No Incident Encountered 0.00 0.00
2015-12-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References