X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515182404000

Well Details

Well ID: 0515182404000
Loading map...
Location: 00/04-24-051-18W5/0
Location Alias: 00/04-24-51-18 W5M
Location Alias 2: 00/04-24-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 24
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 4-24-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0479468
License Date: 2016-05-16
License Status: Issued
Spud Date: 2016-07-27
Final Drill Date: 2016-08-06
Well Total Depth: 4243.00 m
Surface Hole Latitude: 53.425924
Surface Hole Longitude: -116.533103

For data sources see[1][2]

Well History

Date Event
2016-05-16 Obtained License
2016-07-28 Direction Drilling Operation Performed - Deviate
2016-07-28 Surface Casing Operation Performed
2016-08-01 Direction Drilling Operation Performed - Horizontal
2016-08-01 Well Log Performed
2016-08-03 Intermediate Casing Operation Performed
2016-08-06 Finished Drilling
2016-08-06 Well Mode changed to Drilled and Cased
2016-08-07 Liner Casing Operation Performed
2016-08-07 Well Log Performed
2016-08-08 Rig Released
2016-09-01 Well Log Performed
2016-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-07 Well Began Production
2016-09-07 Well Fluid changed to Gas
2016-09-07 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-27 Patterson-UTI Drilling Co. Canada 16E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-07-28 267.70 Deviate (5 - 79 degrees)
2016-08-01 2862.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-02 Multi-Stage Fracture 4187.30 4187.40 0
2016-09-06 Multi-Stage Fracture 3812.00 3812.10 0
2016-09-06 Multi-Stage Fracture 3759.30 3759.40 0
2016-09-06 Multi-Stage Fracture 3706.50 3706.60 0
2016-09-06 Multi-Stage Fracture 3654.10 3654.20 0
2016-09-06 Multi-Stage Fracture 3601.30 3601.40 0
2016-09-06 Multi-Stage Fracture 3548.50 3548.60 0
2016-09-06 Multi-Stage Fracture 3495.70 3495.80 0
2016-09-06 Multi-Stage Fracture 3442.90 3443.00 0
2016-09-06 Multi-Stage Fracture 3390.30 3390.40 0
2016-09-06 Multi-Stage Fracture 3337.70 3337.80 0
2016-09-05 Multi-Stage Fracture 4145.60 4145.70 0
2016-09-06 Multi-Stage Fracture 3285.30 3285.40 0
2016-09-06 Multi-Stage Fracture 3232.50 3232.60 0
2016-09-06 Multi-Stage Fracture 3179.80 3179.90 0
2016-09-06 Multi-Stage Fracture 3127.20 3127.30 0
2016-09-06 Multi-Stage Fracture 3074.40 3074.50 0
2016-09-06 Multi-Stage Fracture 3021.80 3021.90 0
2016-09-06 Multi-Stage Fracture 2969.00 2969.10 0
2016-09-06 Multi-Stage Fracture 4105.50 4105.60 0
2016-09-06 Multi-Stage Fracture 4065.40 4065.50 0
2016-09-06 Multi-Stage Fracture 4025.30 4025.40 0
2016-09-06 Multi-Stage Fracture 3985.20 3985.30 0
2016-09-06 Multi-Stage Fracture 3945.00 3945.10 0
2016-09-06 Multi-Stage Fracture 3904.90 3905.00 0
2016-09-06 Multi-Stage Fracture 3864.80 3864.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-02 2016-09-06 2,734 5,344 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.825 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.1023 N/A
silica crystalline 14808-60-7 100 4.1023 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.6658 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 2.1871 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0107 N/A
2-mercaptoethanol 60-24-2 100 0.0107 N/A
dibromoacetonitrile 3252-43-5 100 0.0107 N/A
non-hazardous ingredients Not Available 100 0.0107 N/A
sodium bromide 7647-15-6 100 0.0107 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.088 N/A
water Not Available 100 0.088 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0824 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0824 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0824 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0824 N/A
non-hazardous ingredients Not Available 100 0.0824 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0383 N/A
methanol 67-56-1 100 0.0383 N/A
water Not Available 100 0.0383 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-05 2016-09-05 Recycled Fracturing Water (treated at well site) 1808
2016-09-05 2016-09-05 Oilfield Produced Water 661
2016-09-04 2016-09-06 Recycled Fracturing Water (treated at well site) 1203
2016-09-05 2016-09-05 Recycled Fracturing Water (treated at well site) 1672

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2521 0.0 0.0 0.0
2017 8284 0.0 0.0 0.0
2018 8655 0.0 0.0 0.0
2019 8757 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-06 No Incident Encountered 0.00 0.00
2016-09-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References