X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515181708002

Well Details

Well ID: 0515181708002
Loading map...
Location: 00/08-17-051-18W5/2
Location Alias: 00/08-17-51-18 W5M
Location Alias 2: 00/08-17-051-18 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 17
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 4-20-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0449008
License Date: 2012-10-04
License Status: Amended
Spud Date: 2012-10-17
Final Drill Date: 2012-11-14
Well Total Depth: 4194.00 m
Surface Hole Latitude: 53.411164
Surface Hole Longitude: -116.626178

For data sources see[1][2]

Well History

Date Event
2012-10-04 Obtained License
2012-10-20 Surface Casing Operation Performed
2012-10-29 Well Log Performed
2012-10-30 Direction Drilling Operation Performed - Deviate
2012-11-04 Intermediate Casing Operation Performed
2012-11-06 Well Log Performed
2012-11-07 Direction Drilling Operation Performed - Horizontal
2012-11-07 Direction Drilling Operation Performed - Sidetrack Fish
2012-11-07 Well Log Performed
2012-11-14 Finished Drilling
2012-11-14 Well Mode changed to Drilled and Cased
2012-11-15 Well Log Performed
2012-11-16 Liner Casing Operation Performed
2012-11-16 Perforation Treatment Performed - Open-Hole Completion
2012-11-16 Well Log Performed
2012-11-17 Rig Released
2012-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-11 Well Began Production
2013-01-11 Well Fluid changed to Gas
2013-01-11 Well Mode changed to Flowing
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-10-30 2427.20 Deviate (5 - 79 degrees)
2012-11-07 2893.20 Sidetrack fish
2012-11-07 2893.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-16 Open Hole/Barefoot Completion 4189.00 4194.00 0
2012-11-27 Multi-Stage Fracture 3336.80 3338.00 0
2012-11-27 Multi-Stage Fracture 3237.70 3239.00 0
2012-11-27 Multi-Stage Fracture 3138.60 3139.80 0
2012-11-27 Multi-Stage Fracture 3039.50 3040.70 0
2012-11-27 Multi-Stage Fracture 2940.30 2941.50 0
2012-11-27 Multi-Stage Fracture 4168.90 4170.00 0
2012-11-27 Multi-Stage Fracture 4066.10 4067.30 0
2012-11-27 Multi-Stage Fracture 3931.60 3932.80 0
2012-11-27 Multi-Stage Fracture 3832.50 3833.70 0
2012-11-27 Multi-Stage Fracture 3733.30 3734.50 0
2012-11-27 Multi-Stage Fracture 3634.20 3635.40 0
2012-11-27 Multi-Stage Fracture 3535.00 3536.20 0
2012-11-27 Multi-Stage Fracture 3435.90 3437.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7767 0.0 0.0 0.0
2014 7008 0.0 0.0 0.0
2015 8385 0.0 0.0 0.0
2016 6586 0.0 0.0 0.0
2017 8645 0.0 0.0 0.0
2018 8699 0.0 0.0 0.0
2019 8736 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-17 No Incident Encountered 0.00 0.00
2012-12-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References