X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515181701000

Well Details

Well ID: 0515181701000
Loading map...
Location: 00/01-17-051-18W5/0
Location Alias: 00/01-17-51-18 W5M
Location Alias 2: 00/01-17-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 17
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 1-17-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0476664
License Date: 2015-08-20
License Status: Amended
Spud Date: 2016-01-04
Final Drill Date: 2016-01-17
Well Total Depth: 4454.00 m
Surface Hole Latitude: 53.405519
Surface Hole Longitude: -116.627622

For data sources see[1][2]

Well History

Date Event
2015-08-20 Obtained License
2016-01-05 Surface Casing Operation Performed
2016-01-05 Well Log Performed
2016-01-10 Direction Drilling Operation Performed - Deviate
2016-01-11 Well Log Performed
2016-01-13 Intermediate Casing Operation Performed
2016-01-14 Direction Drilling Operation Performed - Horizontal
2016-01-17 Finished Drilling
2016-01-17 Well Log Performed
2016-01-17 Well Mode changed to Drilled and Cased
2016-01-18 Liner Casing Operation Performed
2016-01-19 Rig Released
2016-01-22 Well Log Performed
2016-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-28 Well Fluid changed to Gas
2016-01-28 Well Mode changed to Testing
2016-02-07 Well Began Production
2016-02-07 Well Fluid changed to Gas
2016-02-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-01-10 2521.20 Deviate (5 - 79 degrees)
2016-01-14 2966.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-24 Multi-Stage Fracture 4397.70 4397.80 0
2016-01-27 Multi-Stage Fracture 3934.40 3934.50 0
2016-01-27 Multi-Stage Fracture 3881.70 3881.80 0
2016-01-27 Multi-Stage Fracture 3829.00 3829.10 0
2016-01-27 Multi-Stage Fracture 3776.30 3776.40 0
2016-01-27 Multi-Stage Fracture 3723.70 3723.80 0
2016-01-27 Multi-Stage Fracture 3671.00 3671.10 0
2016-01-27 Multi-Stage Fracture 3618.30 3618.40 0
2016-01-27 Multi-Stage Fracture 3565.60 3565.70 0
2016-01-27 Multi-Stage Fracture 3500.20 3500.30 0
2016-01-27 Multi-Stage Fracture 3435.20 3435.30 0
2016-01-26 Multi-Stage Fracture 4356.20 4356.30 0
2016-01-27 Multi-Stage Fracture 3369.80 3369.90 0
2016-01-27 Multi-Stage Fracture 3304.70 3304.80 0
2016-01-27 Multi-Stage Fracture 3239.30 3239.40 0
2016-01-28 Multi-Stage Fracture 3174.00 3174.10 0
2016-01-28 Multi-Stage Fracture 3108.60 3108.70 0
2016-01-28 Multi-Stage Fracture 3043.30 3043.40 0
2016-01-28 Multi-Stage Fracture 2978.50 2978.60 0
2016-01-26 Multi-Stage Fracture 4303.40 4303.50 0
2016-01-26 Multi-Stage Fracture 4250.80 4250.90 0
2016-01-26 Multi-Stage Fracture 4198.10 4198.20 0
2016-01-27 Multi-Stage Fracture 4145.30 4145.40 0
2016-01-27 Multi-Stage Fracture 4092.60 4092.70 0
2016-01-27 Multi-Stage Fracture 4039.90 4040.00 0
2016-01-27 Multi-Stage Fracture 3987.20 3987.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-24 2016-01-28 2,794 6,725 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.7219 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.2715 N/A
silica crystalline 14808-60-7 100 3.2715 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.8817 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8145 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0144 N/A
dibromoacetonitrile 3252-43-5 100 0.0144 N/A
non-hazardous ingredients Not Available 100 0.0144 N/A
polyethylene glycol 25322-68-3 100 0.0144 N/A
sodium bromide 7647-15-6 100 0.0144 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1543 N/A
water Not Available 100 0.1543 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0709 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0709 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0709 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0709 N/A
non-hazardous ingredients Not Available 100 0.0709 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0705 N/A
isopropanol 67-63-0 100 0.0705 N/A
methanol 67-56-1 100 0.0705 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0705 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0705 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 8115 0.0 0.0 0.0
2017 8493 0.0 0.0 0.0
2018 8593 0.0 0.0 0.0
2019 8736 0.0 0.0 0.0
2020 2134 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-19 No Incident Encountered 0.00 0.00
2016-02-07 No Incident Encountered 0.00 0.00

For data sources see[8]

References