X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515181508000

Well Details

Well ID: 0515181508000
Loading map...
Location: 00/08-15-051-18W5/0
Location Alias: 00/08-15-51-18 W5M
Location Alias 2: 00/08-15-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 15
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 8-15-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0487550
License Date: 2018-01-05
License Status: Issued
Spud Date: 2018-02-02
Final Drill Date: 2018-03-04
Well Total Depth: 4463.00 m
Surface Hole Latitude: 53.408657
Surface Hole Longitude: -116.582953

For data sources see[1][2]

Well History

Date Event
2018-01-05 Obtained License
2018-02-02 Direction Drilling Operation Performed - Deviate
2018-02-02 Lost Circulation Occurred
2018-02-04 Surface Casing Operation Performed
2018-02-26 Well Log Performed
2018-02-28 Intermediate Casing Operation Performed
2018-03-01 Direction Drilling Operation Performed - Horizontal
2018-03-04 Finished Drilling
2018-03-04 Well Log Performed
2018-03-04 Well Mode changed to Drilled and Cased
2018-03-05 Liner Casing Operation Performed
2018-03-06 Rig Released
2018-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-21 Well Began Production
2018-03-21 Well Fluid changed to Gas
2018-03-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-02 Patterson-UTI Drilling Co. Canada 15E N/A Set Surface
2018-02-22 Patterson-UTI Drilling Co. Canada 15 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-02 172.70 Deviate (5 - 79 degrees)
2018-03-01 2975.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-19 Multi-Stage Fracture 4412.30 4412.40 0
2018-03-19 Multi-Stage Fracture 3952.90 3953.00 0
2018-03-19 Multi-Stage Fracture 3900.80 3900.90 0
2018-03-19 Multi-Stage Fracture 3848.40 3848.50 0
2018-03-19 Multi-Stage Fracture 3795.90 3796.00 0
2018-03-19 Multi-Stage Fracture 3743.40 3743.50 0
2018-03-19 Multi-Stage Fracture 3690.90 3691.00 0
2018-03-19 Multi-Stage Fracture 3638.30 3638.40 0
2018-03-19 Multi-Stage Fracture 3585.80 3585.90 0
2018-03-19 Multi-Stage Fracture 3533.30 3533.40 0
2018-03-19 Multi-Stage Fracture 3480.80 3480.90 0
2018-03-19 Multi-Stage Fracture 4371.20 4371.30 0
2018-03-19 Multi-Stage Fracture 3428.30 3428.40 0
2018-03-19 Multi-Stage Fracture 3376.00 3376.10 0
2018-03-19 Multi-Stage Fracture 3323.90 3324.00 0
2018-03-19 Multi-Stage Fracture 3271.60 3271.70 0
2018-03-19 Multi-Stage Fracture 3219.10 3219.20 0
2018-03-19 Multi-Stage Fracture 3166.60 3166.70 0
2018-03-19 Multi-Stage Fracture 3114.10 3114.20 0
2018-03-19 Multi-Stage Fracture 3061.80 3061.90 0
2018-03-19 Multi-Stage Fracture 3009.50 3009.60 0
2018-03-19 Multi-Stage Fracture 2957.10 2957.20 0
2018-03-19 Multi-Stage Fracture 4319.10 4319.20 0
2018-03-19 Multi-Stage Fracture 4266.90 4267.00 0
2018-03-19 Multi-Stage Fracture 4214.40 4214.50 0
2018-03-19 Multi-Stage Fracture 4161.90 4162.00 0
2018-03-19 Multi-Stage Fracture 4110.00 4110.10 0
2018-03-19 Multi-Stage Fracture 4057.90 4058.00 0
2018-03-19 Multi-Stage Fracture 4005.30 4005.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-19 2018-03-19 2,775 6,344 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.5381 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.0606 N/A
silica crystalline 14808-60-7 100 4.0606 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.3684 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8532 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0101 N/A
dibromoacetonitrile 3252-43-5 100 0.0101 N/A
non-hazardous ingredients Not Available 100 0.0101 N/A
polyethylene glycol 25322-68-3 100 0.0101 N/A
sodium bromide 7647-15-6 100 0.0101 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0854 N/A
water Not Available 100 0.0854 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0447 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0447 N/A
non-hazardous ingredients Not Available 100 0.0447 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0391 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0391 N/A
methanol 67-56-1 100 0.0391 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0391 N/A
non-hazardous ingredients Not Available 100 0.0391 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-19 2018-03-19 Recycled Fracturing Water (treated at well site) 5402
2018-03-10 2018-03-21 Oilfield Produced Water 941

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6692 0.0 0.0 0.0
2019 8714 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-02 Lost Circulation 25.00 59.00
2018-03-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References