X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515180213000

Well Details

Well ID: 0515180213000
Loading map...
Location: 00/13-02-051-18W5/0
Location Alias: 00/13-02-51-18 W5M
Location Alias 2: 00/13-02-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 02
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ EDSON 13-2-51-18
Operator Name: Tourmaline Oil Corp.
License Number: 0476203
License Date: 2015-07-21
License Status: Issued
Spud Date: 2015-09-02
Final Drill Date: 2015-09-15
Well Total Depth: 4480.00 m
Surface Hole Latitude: 53.378928
Surface Hole Longitude: -116.582700

For data sources see[1][2]

Well History

Date Event
2015-07-21 Obtained License
2015-09-03 Surface Casing Operation Performed
2015-09-09 Direction Drilling Operation Performed - Deviate
2015-09-11 Direction Drilling Operation Performed - Horizontal
2015-09-11 Well Log Performed
2015-09-12 Intermediate Casing Operation Performed
2015-09-12 Well Log Performed
2015-09-15 Finished Drilling
2015-09-15 Well Log Performed
2015-09-15 Well Mode changed to Drilled and Cased
2015-09-18 Liner Casing Operation Performed
2015-09-18 Rig Released
2015-09-23 Well Log Performed
2015-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-30 Well Began Production
2015-09-30 Well Fluid changed to Gas
2015-09-30 Well Mode changed to Flowing
2016-12-27 Well Fluid changed to Gas
2016-12-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-02 Nabors Drilling Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-09 2363.70 Deviate (5 - 79 degrees)
2015-09-11 2766.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-26 Multi-Stage Fracture 4426.20 4426.30 0
2015-09-28 Multi-Stage Fracture 3870.80 3870.90 0
2015-09-28 Multi-Stage Fracture 3817.60 3817.70 0
2015-09-28 Multi-Stage Fracture 3751.80 3751.90 0
2015-09-28 Multi-Stage Fracture 3685.90 3686.00 0
2015-09-28 Multi-Stage Fracture 3620.10 3620.20 0
2015-09-28 Multi-Stage Fracture 3555.20 3555.30 0
2015-09-29 Multi-Stage Fracture 3489.30 3489.40 0
2015-09-29 Multi-Stage Fracture 3423.50 3423.60 0
2015-09-29 Multi-Stage Fracture 3357.60 3357.70 0
2015-09-29 Multi-Stage Fracture 3291.80 3291.90 0
2015-09-27 Multi-Stage Fracture 4384.10 4384.20 0
2015-09-29 Multi-Stage Fracture 3226.00 3226.10 0
2015-09-29 Multi-Stage Fracture 3160.10 3160.20 0
2015-09-29 Multi-Stage Fracture 3094.30 3094.40 0
2015-09-29 Multi-Stage Fracture 3028.40 3028.50 0
2015-09-29 Multi-Stage Fracture 2962.60 2962.70 0
2015-09-29 Multi-Stage Fracture 2896.90 2897.00 0
2015-09-29 Multi-Stage Fracture 2843.70 2843.80 0
2015-09-28 Multi-Stage Fracture 4331.00 4331.10 0
2015-09-28 Multi-Stage Fracture 4265.10 4265.20 0
2015-09-28 Multi-Stage Fracture 4199.50 4199.60 0
2015-09-28 Multi-Stage Fracture 4133.60 4133.70 0
2015-09-28 Multi-Stage Fracture 4068.00 4068.10 0
2015-09-28 Multi-Stage Fracture 4002.10 4002.20 0
2015-09-28 Multi-Stage Fracture 3936.60 3936.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-26 2015-09-29 2,681 5,298 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.5577 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.9434 N/A
silica crystalline 14808-60-7 100 4.9434 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.9542 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8334 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
polyethylene glycol 25322-68-3 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1814 N/A
non-hazardous ingredients Not Available 100 0.1814 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0858 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0858 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0858 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0858 N/A
non-hazardous ingredients Not Available 100 0.0858 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0681 N/A
isopropanol 67-63-0 100 0.0681 N/A
methanol 67-56-1 100 0.0681 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0681 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0681 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-26 2015-09-29 Surface Water - Lake 5298

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1932 0.0 0.0 0.0
2016 8775 0.0 0.0 0.0
2017 8531 0.0 0.0 0.0
2018 8521 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-15 No Incident Encountered 0.00 0.00
2015-10-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References