X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515171615000

Well Details

Well ID: 0515171615000
Loading map...
Location: 00/15-16-051-17W5/0
Location Alias: 00/15-16-51-17 W5M
Location Alias 2: 00/15-16-051-17 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 16
County/Municipality: Yellowhead County
Well Name: TALISMAN HZ EDSON 15-16-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0474625
License Date: 2015-02-18
License Status: Amended
Spud Date: 2015-11-03
Final Drill Date: 2015-11-14
Well Total Depth: 4340.00 m
Surface Hole Latitude: 53.395260
Surface Hole Longitude: -116.432291

For data sources see[1][2]

Well History

Date Event
2015-02-18 Obtained License
2015-11-04 Surface Casing Operation Performed
2015-11-08 Direction Drilling Operation Performed - Deviate
2015-11-09 Well Log Performed
2015-11-10 Intermediate Casing Operation Performed
2015-11-12 Direction Drilling Operation Performed - Horizontal
2015-11-14 Finished Drilling
2015-11-14 Well Log Performed
2015-11-14 Well Mode changed to Drilled and Cased
2015-11-17 Production Casing Operation Performed
2015-11-17 Well Log Performed
2015-11-18 Rig Released
2016-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-28 Well Fluid changed to Shale Gas Only
2016-01-28 Well Mode changed to Testing
2016-03-02 Well Began Production
2016-03-02 Well Fluid changed to Shale Gas Only
2016-03-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-03 Precision Drilling Corporation 545 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-08 2390.00 Deviate (5 - 79 degrees)
2015-11-12 2810.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-23 Multi-Stage Fracture 4286.50 4286.60 0
2016-01-23 Multi-Stage Fracture 3691.50 3691.60 0
2016-01-23 Multi-Stage Fracture 3623.70 3623.80 0
2016-01-23 Multi-Stage Fracture 3555.40 3555.50 0
2016-01-24 Multi-Stage Fracture 3490.80 3490.90 0
2016-01-24 Multi-Stage Fracture 3422.30 3422.40 0
2016-01-24 Multi-Stage Fracture 3354.20 3354.30 0
2016-01-24 Multi-Stage Fracture 3285.50 3285.60 0
2016-01-24 Multi-Stage Fracture 3217.00 3217.10 0
2016-01-24 Multi-Stage Fracture 3149.10 3149.20 0
2016-01-24 Multi-Stage Fracture 3083.20 3083.30 0
2016-01-23 Multi-Stage Fracture 4229.80 4229.90 0
2016-01-24 Multi-Stage Fracture 3014.40 3014.50 0
2016-01-24 Multi-Stage Fracture 2944.80 2944.90 0
2016-01-24 Multi-Stage Fracture 2877.70 2877.80 0
2016-01-24 Multi-Stage Fracture 2810.70 2810.80 0
2016-01-23 Multi-Stage Fracture 4163.10 4163.20 0
2016-01-23 Multi-Stage Fracture 4096.00 4096.10 0
2016-01-23 Multi-Stage Fracture 4027.30 4027.40 0
2016-01-23 Multi-Stage Fracture 3960.90 3961.00 0
2016-01-23 Multi-Stage Fracture 3892.10 3892.20 0
2016-01-23 Multi-Stage Fracture 3827.60 3827.70 0
2016-01-23 Multi-Stage Fracture 3760.70 3760.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-23 2016-01-24 2,663 7,799 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.7706 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 8.3452 N/A
40/70 Sanjel Crystalline Silica 14808-60-7 100 1.2369 N/A
B-1008 Sanjel Bactericide/Biocide Broponol 52-51-7 100 0.0172 N/A
Methanol 67-56-1 100 0.0172 N/A
Non-Hazardous Ingredients Not Available 100 0.0172 N/A
SCC-1L Sanjel Clay Control Non-Hazardous Ingredients Not Available 100 0.1646 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0715 N/A
Non-Hazardous Ingredients Not Available 100 0.0715 N/A
Surfactant 68131-40-8 100 0.0715 N/A
SI-18 (TPC-F-038) Sanjel Scale Inhibitor Non-Hazardous Ingredients Not Available 100 0.0085 N/A
NE-8 (LDP-F-2415) Sanjel Surfactant 2-Propanol 67-63-0 100 0.0398 N/A
Non-Hazardous Ingredients Not Available 100 0.0398 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-01-16 2016-01-23 Municipal Water 780
2016-01-11 2016-01-23 Municipal Water 900
2016-01-16 2016-01-17 Surface Water - Lake 2541
2016-01-11 2016-01-23 Recycled Fracturing Water (treated at well site) 3811

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7124 0.0 0.0 0.0
2017 7897 0.0 0.0 0.0
2018 6117 0.0 0.0 0.0
2019 8086 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-18 No Incident Encountered 0.00 0.00
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References