X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515170601000

Well Details

Well ID: 0515170601000
Loading map...
Location: 00/01-06-051-17W5/0
Location Alias: 00/01-06-51-17 W5M
Location Alias 2: 00/01-06-051-17 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 06
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL HZ EDSON 1-6-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0476759
License Date: 2015-09-01
License Status: Issued
Spud Date: 2016-01-05
Final Drill Date: 2016-01-24
Well Total Depth: 4850.00 m
Surface Hole Latitude: 53.379668
Surface Hole Longitude: -116.508442

For data sources see[1][2]

Well History

Date Event
2015-09-01 Obtained License
2016-01-08 Surface Casing Operation Performed
2016-01-12 Direction Drilling Operation Performed - Deviate
2016-01-13 Well Log Performed
2016-01-14 Well Log Performed
2016-01-17 Intermediate Casing Operation Performed
2016-01-18 Direction Drilling Operation Performed - Horizontal
2016-01-24 Finished Drilling
2016-01-24 Well Log Performed
2016-01-24 Well Mode changed to Drilled and Cased
2016-01-26 Liner Casing Operation Performed
2016-01-27 Liner Casing Operation Performed
2016-01-27 Perforation Treatment Performed - Open-Hole Completion
2016-01-27 Rig Released
2016-01-27 Well Log Performed
2016-02-23 Well Log Performed
2016-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-12 Well Fluid changed to Shale Gas and Other
2016-03-12 Well Mode changed to Testing
2016-04-01 Well Began Production
2016-04-01 Well Fluid changed to Shale Gas and Other
2016-04-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-07 Horizon Drilling Inc. 48 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-12 2482.70 Deviate (5 - 79 degrees)
2016-01-18 2933.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-27 Open Hole/Barefoot Completion 4844.00 4850.00 0
2016-03-03 Multi-Stage Fracture 4263.80 4263.90 0
2016-03-03 Multi-Stage Fracture 4194.10 4194.20 0
2016-03-03 Multi-Stage Fracture 4124.50 4124.60 0
2016-03-03 Multi-Stage Fracture 4055.00 4055.10 0
2016-03-03 Multi-Stage Fracture 3985.50 3985.60 0
2016-03-03 Multi-Stage Fracture 3916.40 3916.50 0
2016-03-03 Multi-Stage Fracture 3847.90 3848.00 0
2016-03-03 Multi-Stage Fracture 3778.80 3778.90 0
2016-03-03 Multi-Stage Fracture 3710.40 3710.50 0
2016-03-03 Multi-Stage Fracture 3641.60 3641.70 0
2016-03-02 Multi-Stage Fracture 4804.90 4805.00 0
2016-03-03 Multi-Stage Fracture 3572.00 3572.10 0
2016-03-03 Multi-Stage Fracture 3504.20 3504.30 0
2016-03-03 Multi-Stage Fracture 3435.90 3436.00 0
2016-03-03 Multi-Stage Fracture 3367.90 3368.00 0
2016-03-03 Multi-Stage Fracture 3303.30 3303.40 0
2016-03-03 Multi-Stage Fracture 3234.10 3234.20 0
2016-03-03 Multi-Stage Fracture 3165.50 3165.60 0
2016-03-03 Multi-Stage Fracture 3096.80 3096.90 0
2016-03-04 Multi-Stage Fracture 3028.70 3028.80 0
2016-03-04 Multi-Stage Fracture 2960.70 2960.80 0
2016-03-02 Multi-Stage Fracture 4760.70 4760.80 0
2016-03-02 Multi-Stage Fracture 4677.70 4677.80 0
2016-03-03 Multi-Stage Fracture 4608.50 4608.60 0
2016-03-03 Multi-Stage Fracture 4540.40 4540.50 0
2016-03-03 Multi-Stage Fracture 4470.80 4470.90 0
2016-03-03 Multi-Stage Fracture 4402.80 4402.90 0
2016-03-03 Multi-Stage Fracture 4333.20 4333.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-02 2016-03-04 2,784 10,185 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.4034 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 7.9988 N/A
40/70 Sanjel Crystalline Silica 14808-60-7 100 1.157 N/A
B-1008 Sanjel Bactericide/Biocide Broponol 52-51-7 100 0.0165 N/A
Methanol 67-56-1 100 0.0165 N/A
Non-Hazardous Ingredients Not Available 100 0.0165 N/A
SCC-1L Sanjel Clay Control Non-Hazardous Ingredients Not Available 100 0.1655 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0672 N/A
Non-Hazardous Ingredients Not Available 100 0.0672 N/A
Surfactant 68131-40-8 100 0.0672 N/A
SI-18 (TPC-F-038) Sanjel Scale Inhibitor Non-Hazardous Ingredients Not Available 100 0.0081 N/A
NE-8 (LDP-F-2415) Sanjel Surfactant 2-Propanol 67-63-0 100 0.0413 N/A
Non-Hazardous Ingredients Not Available 100 0.0413 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-24 2016-02-29 Recycled Fracturing Water (treated at well site) 3881
2016-02-23 2016-03-07 Surface Water - River 7577

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6342 0.0 0.0 0.0
2017 7680 0.0 0.0 0.0
2018 8638 0.0 0.0 0.0
2019 8209 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-27 No Incident Encountered 0.00 0.00
2016-03-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References