If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515162316020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.43786,"lon":-116.263441,"icon":""}]} |
| Location: 02/16-23-051-16W5/0 | |
| Location Alias: 02/16-23-51-16 W5M | |
| Location Alias 2: 02/16-23-051-16 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 16 | |
| Section: 23 | |
| County/Municipality: Yellowhead County | |
| Well Name: POC HZ EDSON 16-23-51-16 | |
| Operator Name: Perpetual Operating Corp. | |
| License Number: 0481581 | |
| License Date: 2016-11-23 | |
| License Status: Issued | |
| Spud Date: 2017-02-19 | |
| Final Drill Date: 2017-03-05 | |
| Well Total Depth: 4709.00 m | |
| Surface Hole Latitude: 53.437860 | |
| Surface Hole Longitude: -116.263441 |
| Date | Event |
|---|---|
| 2016-11-23 | Obtained License |
| 2017-02-21 | Surface Casing Operation Performed |
| 2017-02-23 | Direction Drilling Operation Performed - Deviate |
| 2017-02-26 | Direction Drilling Operation Performed - Horizontal |
| 2017-03-05 | Finished Drilling |
| 2017-03-05 | Well Log Performed |
| 2017-03-05 | Well Mode changed to Drilled and Cased |
| 2017-03-07 | Production Casing Operation Performed |
| 2017-03-08 | Production Casing Operation Performed |
| 2017-03-08 | Rig Released |
| 2017-07-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-07-12 | Well Began Production |
| 2017-07-12 | Well Fluid changed to Gas |
| 2017-07-12 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-02-19 | Ironhand Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-02-23 | 2138.90 | Deviate (5 - 79 degrees) |
| 2017-02-26 | 2695.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-07-04 | Multi-Stage Fracture | 4645.30 | 4645.40 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3885.80 | 3885.90 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3791.30 | 3791.40 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3697.80 | 3697.90 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3615.20 | 3615.30 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3521.00 | 3521.10 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3427.10 | 3427.20 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3344.30 | 3344.40 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3249.60 | 3249.70 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3155.10 | 3155.20 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3072.30 | 3072.40 | 0 |
| 2017-07-04 | Multi-Stage Fracture | 4572.90 | 4573.00 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 2978.00 | 2978.10 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 2895.30 | 2895.40 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 2800.90 | 2801.00 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 2707.40 | 2707.50 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4501.30 | 4501.40 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4418.20 | 4418.30 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4335.10 | 4335.20 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4240.50 | 4240.60 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4145.90 | 4146.00 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 4063.50 | 4063.60 | 0 |
| 2017-07-05 | Multi-Stage Fracture | 3968.80 | 3968.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-07-04 | 2017-07-05 | 2,560 | 7,318 | N/A |
| 2 | 2017-07-05 | 2017-07-05 | 2,560 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 84.1939 | N/A | |||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.01 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.01 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.01 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.01 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1574 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1574 | N/A | ||||
| FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0866 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0866 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0866 | N/A | ||||
| SI-14 | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0333 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0333 | N/A | ||||
| 2 | Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 14.5527 | N/A | |
| Super LC (30/50) | Trican | phenolic resin | 9003-35-4 | 100 | 2.4438 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 2.4438 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-05-13 | 2017-06-25 | Surface Water - River | 4142 |
| 2017-07-01 | 2017-07-03 | Recycled Fracturing Water (treated at well site) | 2797 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 3768 | 0.0 | 0.0 | 0.0 |
| 2018 | 8247 | 0.0 | 0.0 | 0.0 |
| 2019 | 8687 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-07-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]