X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515162304002

Well Details

Well ID: 0515162304002
Loading map...
Location: 00/04-23-051-16W5/2
Location Alias: 00/04-23-51-16 W5M
Location Alias 2: 00/04-23-051-16 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 16
Section: 23
County/Municipality: Yellowhead County
Well Name: POC HZ EDSON 4-23-51-16
Operator Name: Perpetual Operating Corp.
License Number: 0483391
License Date: 2017-04-11
License Status: Amended
Spud Date: 2017-08-16
Final Drill Date: 2017-09-25
Well Total Depth: 5165.00 m
Surface Hole Latitude: 53.429580
Surface Hole Longitude: -116.283028

For data sources see[1][2]

Well History

Date Event
2017-04-11 Obtained License
2017-08-17 Surface Casing Operation Performed
2017-08-18 Direction Drilling Operation Performed - Deviate
2017-09-10 Intermediate Casing Operation Performed
2017-09-14 Direction Drilling Operation Performed - Horizontal
2017-09-25 Finished Drilling
2017-09-25 Well Log Performed
2017-09-25 Well Mode changed to Drilled and Cased
2017-09-27 Production Casing Operation Performed
2017-09-28 Perforation Treatment Performed - Open-Hole Completion
2017-09-28 Rig Released
2017-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-05 Well Began Production
2017-12-05 Well Fluid changed to Gas
2017-12-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-08-18 701.40 Deviate (5 - 79 degrees)
2017-09-14 2161.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-28 Open Hole/Barefoot Completion 5149.00 5165.00 0
2017-11-29 Multi-Stage Fracture 4356.10 4356.20 0
2017-11-29 Multi-Stage Fracture 4258.70 4258.80 0
2017-11-30 Multi-Stage Fracture 4162.60 4162.70 0
2017-11-30 Multi-Stage Fracture 4064.90 4065.00 0
2017-11-30 Multi-Stage Fracture 3968.30 3968.40 0
2017-11-30 Multi-Stage Fracture 3872.60 3872.70 0
2017-11-30 Multi-Stage Fracture 3774.90 3775.00 0
2017-11-30 Multi-Stage Fracture 3678.10 3678.20 0
2017-11-30 Multi-Stage Fracture 3595.70 3595.80 0
2017-11-30 Multi-Stage Fracture 3513.00 3513.10 0
2017-11-29 Multi-Stage Fracture 5105.30 5105.40 0
2017-11-30 Multi-Stage Fracture 3429.20 3429.30 0
2017-11-30 Multi-Stage Fracture 3345.20 3345.30 0
2017-11-30 Multi-Stage Fracture 3262.80 3262.90 0
2017-11-30 Multi-Stage Fracture 3181.40 3181.50 0
2017-11-30 Multi-Stage Fracture 3100.00 3100.10 0
2017-11-30 Multi-Stage Fracture 3018.80 3018.90 0
2017-11-30 Multi-Stage Fracture 2940.20 2940.30 0
2017-11-30 Multi-Stage Fracture 2858.50 2858.60 0
2017-11-30 Multi-Stage Fracture 2789.50 2789.60 0
2017-11-30 Multi-Stage Fracture 2733.00 2733.10 0
2017-11-29 Multi-Stage Fracture 5029.90 5030.00 0
2017-11-29 Multi-Stage Fracture 4933.50 4933.60 0
2017-11-29 Multi-Stage Fracture 4838.60 4838.70 0
2017-11-29 Multi-Stage Fracture 4741.80 4741.90 0
2017-11-29 Multi-Stage Fracture 4644.70 4644.80 0
2017-11-29 Multi-Stage Fracture 4548.90 4549.00 0
2017-11-29 Multi-Stage Fracture 4453.10 4453.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-29 2017-11-30 2,591 0 N/A
2 2017-11-29 2017-11-29 2,591 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - Fresh Not Available 100 81.9744 N/A
Sand - Tier 1 (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 14.9873 N/A
Crystalline silica. quartz 14808-60-7 100 14.9873 N/A
Iron Oxide 1309-37-1 100 14.9873 N/A
Titanium Oxide 13463-67-7 100 14.9874 N/A
Super LC (30/50) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 2.5848 N/A
Hexamethylenetetramine 100-97-0 100 2.5848 N/A
Phenol formaldehyde resin 9003-35-4 100 2.5848 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
2-mercaptoethanol 60-24-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.0909 N/A
non-hazardous ingredients Not Available 100 0.0909 N/A
FR-22 (Friction Reducer) Trican Well Service Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0478 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0478 N/A
non-hazardous ingredients Not Available 100 0.0478 N/A
SI-18 (Scale Inhibitor) Trican Well Service Scale Inhibitor non-hazardous ingredients Not Available 100 0.0387 N/A
S-17X (Surfactant) Trican Well Service Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0345 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0345 N/A
methanol 67-56-1 100 0.0345 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0345 N/A
non-hazardous ingredients Not Available 100 0.0345 N/A
2 Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 1.745 N/A
Non-hazardous base ingredient(s) Not Available 100 1.745 N/A
SS-9 Surfactant Canyon Technical Services Surfactant No specific ingredients Not Available 100 0.0544 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-22 2017-11-23 Recycled Fracturing Water (treated at well site) 1602
2017-11-22 2017-11-23 Recycled Fracturing Water (treated at well site) 2264
2017-11-20 2017-11-22 Oilfield Produced Water 2100
2017-09-21 2017-10-12 Groundwater - Non-saline less than or equal to 150m deep 3336

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 648 0.0 0.0 0.0
2018 7871 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-27 No Incident Encountered 0.00 0.00
2017-11-29 No Incident Encountered 0.00 0.00

For data sources see[9]

References