X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515161608000

Well Details

Well ID: 0515161608000
Loading map...
Location: 00/08-16-051-16W5/0
Location Alias: 00/08-16-51-16 W5M
Location Alias 2: 00/08-16-051-16 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 16
Section: 16
County/Municipality: Yellowhead County
Well Name: POC HZ EDSON 8-16-51-16
Operator Name: Perpetual Operating Corp.
License Number: 0471365
License Date: 2014-11-13
License Status: Issued
Spud Date: 2014-12-10
Final Drill Date: 2015-01-08
Well Total Depth: 4603.00 m
Surface Hole Latitude: 53.411663
Surface Hole Longitude: -116.313323

For data sources see[1][2]

Well History

Date Event
2014-11-13 Obtained License
2014-12-11 Surface Casing Operation Performed
2014-12-12 Direction Drilling Operation Performed - Deviate
2014-12-15 Direction Drilling Operation Performed - Deviate
2014-12-18 Direction Drilling Operation Performed - Horizontal
2014-12-18 Intermediate Casing Operation Performed
2015-01-07 Well Log Performed
2015-01-08 Finished Drilling
2015-01-08 Well Mode changed to Drilled and Cased
2015-01-10 Liner Casing Operation Performed
2015-01-10 Perforation Treatment Performed - Open-Hole Completion
2015-01-10 Rig Released
2015-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-03 Well Began Production
2015-02-03 Well Fluid changed to Gas
2015-02-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-10 Ironhand Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-12 679.00 Deviate (5 - 79 degrees)
2014-12-15 2345.00 Deviate (5 - 79 degrees)
2014-12-18 2856.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-10 Open Hole/Barefoot Completion 4586.00 4603.00 0
2015-01-30 Multi-Stage Fracture 3817.20 3817.30 0
2015-01-30 Multi-Stage Fracture 3733.80 3733.90 0
2015-01-30 Multi-Stage Fracture 3637.50 3637.60 0
2015-01-30 Multi-Stage Fracture 3553.20 3553.30 0
2015-01-30 Multi-Stage Fracture 3457.80 3457.90 0
2015-01-30 Multi-Stage Fracture 3373.90 3374.00 0
2015-01-30 Multi-Stage Fracture 3277.40 3277.50 0
2015-01-30 Multi-Stage Fracture 3193.10 3193.20 0
2015-01-30 Multi-Stage Fracture 3096.80 3096.90 0
2015-01-30 Multi-Stage Fracture 3012.40 3012.50 0
2015-01-30 Multi-Stage Fracture 4564.20 4564.30 0
2015-01-30 Multi-Stage Fracture 4092.40 4092.50 0
2015-01-30 Multi-Stage Fracture 4450.60 4450.70 0
2015-01-30 Multi-Stage Fracture 4355.40 4355.50 0
2015-01-30 Multi-Stage Fracture 4271.70 4271.80 0
2015-01-30 Multi-Stage Fracture 4175.80 4175.90 0
2015-01-30 Multi-Stage Fracture 3996.60 3996.70 0
2015-01-30 Multi-Stage Fracture 3912.70 3912.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-30 2015-01-30 2,670 5,975 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.2117 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 8.1394 N/A
50/140 Sanjel Crystalline Silica 14808-60-7 100 1.2522 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0087 N/A
Methyl Alcohol 67-56-1 100 0.0087 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1653 N/A
Non-Hazardous Ingredients Not Available 100 0.1653 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.083 N/A
Non-Hazardous Ingredients Not Available 100 0.083 N/A
Surfactant 68131-40-8 100 0.083 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-13 2015-02-02 Surface Water - Lake 4285

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7462 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7967 0.0 0.0 0.0
2018 2345 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-10 No Incident Encountered 0.00 0.00
2015-02-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References