If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515153102020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.453319,"lon":-116.211835,"icon":""}]} |
| Location: 02/02-31-051-15W5/0 | |
| Location Alias: 02/02-31-51-15 W5M | |
| Location Alias 2: 02/02-31-051-15 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 15 | |
| Section: 31 | |
| County/Municipality: Yellowhead County | |
| Well Name: POC EDSON 2-31-51-15 | |
| Operator Name: Perpetual Operating Corp. | |
| License Number: 0468197 | |
| License Date: 2014-07-17 | |
| License Status: Issued | |
| Spud Date: 2014-10-09 | |
| Final Drill Date: 2014-10-23 | |
| Well Total Depth: 4039.00 m | |
| Surface Hole Latitude: 53.453319 | |
| Surface Hole Longitude: -116.211835 |
| Date | Event |
|---|---|
| 2014-07-17 | Obtained License |
| 2014-10-10 | Surface Casing Operation Performed |
| 2014-10-13 | Well Log Performed |
| 2014-10-14 | Direction Drilling Operation Performed - Deviate |
| 2014-10-16 | Well Log Performed |
| 2014-10-17 | Intermediate Casing Operation Performed |
| 2014-10-19 | Direction Drilling Operation Performed - Horizontal |
| 2014-10-23 | Finished Drilling |
| 2014-10-23 | Well Log Performed |
| 2014-10-24 | Well Mode changed to Drilled and Cased |
| 2014-10-25 | Liner Casing Operation Performed |
| 2014-10-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-10-25 | Rig Released |
| 2014-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-16 | Well Began Production |
| 2014-12-16 | Well Fluid changed to Gas |
| 2014-12-16 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-10-09 | Ironhand Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-10-14 | 2095.00 | Deviate (5 - 79 degrees) |
| 2014-10-19 | 2580.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-10-25 | Open Hole/Barefoot Completion | 4025.00 | 4039.00 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3278.00 | 3278.10 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3195.10 | 3195.20 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3100.20 | 3100.30 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3016.30 | 3016.40 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 2921.30 | 2921.40 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 2825.70 | 2825.80 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 2742.40 | 2742.50 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 2647.80 | 2647.90 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3995.50 | 3995.60 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3911.70 | 3911.80 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3816.00 | 3816.10 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3731.70 | 3731.80 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3636.80 | 3636.90 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3553.10 | 3553.20 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3457.50 | 3457.60 | 0 |
| 2014-12-07 | Multi-Stage Fracture | 3373.40 | 3373.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-12-07 | 2014-12-07 | 2,473 | 5,309 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 82.8521 | N/A | |||
| 30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 8.1609 | N/A | ||
| 50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.1355 | N/A | ||
| B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0091 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0091 | N/A | ||||
| SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.165 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.165 | N/A | ||||
| FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0839 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0839 | N/A | ||||
| Surfactant | 68131-40-8 | 100 | 0.0839 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-11-20 | 2014-12-19 | Surface Water - Lake | 7000 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 96 | 0.0 | 0.0 | 0.0 |
| 2015 | 2784 | 0.0 | 0.0 | 0.0 |
| 2016 | 8735 | 0.0 | 0.0 | 0.0 |
| 2017 | 8280 | 0.0 | 0.0 | 0.0 |
| 2018 | 8711 | 0.0 | 0.0 | 0.0 |
| 2019 | 8687 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-10-25 | No Incident Encountered | 0.00 | 0.00 |
| 2014-12-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]