If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515122012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.419675,"lon":-115.744563,"icon":""}]} |
| Location: 00/12-20-051-12W5/0 | |
| Location Alias: 00/12-20-51-12 W5M | |
| Location Alias 2: 00/12-20-051-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: INVERNESS ET AL CYN-PEM 12-20-51-12 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0115217 | |
| License Date: 1985-06-10 | |
| License Status: RecCertified | |
| Spud Date: 1985-06-18 | |
| Final Drill Date: 1985-06-27 | |
| Well Total Depth: 1800.00 m | |
| Surface Hole Latitude: 53.419675 | |
| Surface Hole Longitude: -115.744563 |
| Date | Event |
|---|---|
| 1985-06-10 | Obtained License |
| 1985-06-19 | Surface Casing Operation Performed |
| 1985-06-21 | Direction Drilling Operation Performed - Deviate |
| 1985-06-27 | Finished Drilling |
| 1985-06-27 | Well Log Performed |
| 1985-06-27 | Well Mode changed to Drilled and Cased |
| 1985-06-28 | Production Casing Operation Performed |
| 1985-06-29 | Rig Released |
| 1985-07-22 | Well Log Performed |
| 1985-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-07-23 | Perforation Treatment Performed - Jet Perforation |
| 1985-07-27 | Perforation Treatment Performed - Fractured |
| 1985-08-06 | Well Began Production |
| 1985-08-06 | Well Fluid changed to Crude Oil |
| 1985-08-06 | Well Mode changed to Flowing |
| 1985-10-31 | Well Log Performed |
| 1989-06-25 | Well Log Performed |
| 1989-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-06-26 | Plug Back Performed |
| 1989-06-26 | Well Abandoned |
| 1989-06-26 | Well Fluid changed to Crude Oil |
| 1989-06-26 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1985-06-21 | 733.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-07-23 | Perforation | 1768.80 | 1770.20 | 13 |
| 1985-07-23 | Acid Treatment | 1768.80 | 1770.20 | 0 |
| 1985-07-27 | Fracture | 1768.80 | 1770.20 | 0 |
| 1989-06-26 | Packing Device Capped w/Cement | 1747.00 | 1755.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 3084 | 0.0 | 0.0 | 0.0 |
| 1986 | 7048 | 0.0 | 0.0 | 0.0 |
| 1987 | 6110 | 0.0 | 0.0 | 0.0 |
| 1988 | 3628 | 0.0 | 0.0 | 0.0 |
For data sources see[6]