X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515121006000

Well Details

Well ID: 0515121006000
Loading map...
Location: 00/06-10-051-12W5/0
Location Alias: 00/06-10-51-12 W5M
Location Alias 2: 00/06-10-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 10
County/Municipality: Yellowhead County
Well Name: BACCALIEU PEMBINA 6-10-51-12
Operator Name: Baccalieu Energy Inc.
License Number: 0424663
License Date: 2010-10-14
License Status: Issued
Spud Date: 2010-12-28
Final Drill Date: 2011-01-10
Well Total Depth: 3723.00 m
Surface Hole Latitude: 53.385877
Surface Hole Longitude: -115.717194

For data sources see[1][2]

Well History

Date Event
2010-10-14 Obtained License
2010-12-30 Surface Casing Operation Performed
2011-01-01 Direction Drilling Operation Performed - Horizontal
2011-01-10 Finished Drilling
2011-01-10 Well Mode changed to Drilled and Cased
2011-01-12 Production Casing Operation Performed
2011-01-13 Rig Released
2011-03-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-03-13 Perforation Treatment Performed - Fractured
2011-03-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-03-14 Perforation Treatment Performed - Fractured
2011-04-01 Well Began Production
2011-04-01 Well Fluid changed to Crude Oil
2011-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-01 1531.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-13 Hydra Jet Perforation 3683.40 3683.50 1
2011-03-13 Fracture 3175.00 3175.10 0
2011-03-13 Hydra Jet Perforation 2991.00 2991.10 1
2011-03-13 Fracture 2991.00 2991.10 0
2011-03-13 Hydra Jet Perforation 2812.30 2812.40 1
2011-03-13 Fracture 2812.30 2812.40 0
2011-03-14 Hydra Jet Perforation 2631.20 2631.30 1
2011-03-14 Fracture 2631.20 2631.30 0
2011-03-14 Hydra Jet Perforation 2616.50 2616.60 1
2011-03-14 Fracture 2616.50 2616.60 0
2011-03-14 Hydra Jet Perforation 2448.00 2448.10 1
2011-03-13 Fracture 3683.40 3683.50 0
2011-03-14 Fracture 2448.00 2448.10 0
2011-03-14 Hydra Jet Perforation 2274.00 2274.10 1
2011-03-14 Fracture 2274.00 2274.10 0
2011-03-14 Hydra Jet Perforation 2260.00 2260.10 1
2011-03-14 Fracture 2260.00 2260.10 0
2011-03-14 Hydra Jet Perforation 2096.00 2096.10 1
2011-03-14 Fracture 2096.00 2096.10 0
2011-03-14 Hydra Jet Perforation 1923.00 1923.10 1
2011-03-14 Fracture 1923.00 1923.10 0
2011-03-13 Hydra Jet Perforation 3518.00 3518.10 1
2011-03-13 Fracture 3518.00 3518.10 0
2011-03-13 Hydra Jet Perforation 3507.00 3507.10 1
2011-03-13 Fracture 3507.00 3507.10 0
2011-03-13 Hydra Jet Perforation 3348.00 3348.10 1
2011-03-13 Fracture 3348.00 3348.10 0
2011-03-13 Hydra Jet Perforation 3175.00 3175.10 1

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5433 0.0 0.0 0.0
2012 8379 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8559 0.0 0.0 0.0
2015 8622 0.0 0.0 0.0
2016 8666 0.0 0.0 0.0
2017 8326 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[6]

References