X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515120614000

Well Details

Well ID: 0515120614000
Loading map...
Location: 00/14-06-051-12W5/0
Location Alias: 00/14-06-51-12 W5M
Location Alias 2: 00/14-06-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 06
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 14-6-51-12
Operator Name: Ridgeback Resources Inc.
License Number: 0430202
License Date: 2011-01-18
License Status: Issued
Spud Date: 2011-01-30
Final Drill Date: 2011-02-12
Well Total Depth: 3393.00 m
Surface Hole Latitude: 53.365247
Surface Hole Longitude: -115.764516

For data sources see[1][2]

Well History

Date Event
2011-01-18 Obtained License
2011-01-30 Lost Circulation Occurred
2011-02-02 Surface Casing Operation Performed
2011-02-03 Well Log Performed
2011-02-04 Direction Drilling Operation Performed - Horizontal
2011-02-12 Finished Drilling
2011-02-12 Perforation Treatment Performed - Open-Hole Completion
2011-02-12 Well Log Performed
2011-02-12 Well Mode changed to Drilled and Cased
2011-02-15 Production Casing Operation Performed
2011-02-16 Rig Released
2011-02-22 Well Log Performed
2011-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-30 Well Began Production
2011-03-30 Well Fluid changed to Crude Oil
2011-03-30 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-04 1486.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-12 Open Hole/Barefoot Completion 3389.60 3393.00 0
2011-03-27 Multi-Stage Fracture 2841.70 2841.80 0
2011-03-27 Multi-Stage Fracture 2778.30 2778.40 0
2011-03-27 Multi-Stage Fracture 2703.90 2704.00 0
2011-03-27 Multi-Stage Fracture 2640.60 2640.70 0
2011-03-27 Multi-Stage Fracture 2577.20 2577.30 0
2011-03-27 Multi-Stage Fracture 2513.90 2514.00 0
2011-03-27 Multi-Stage Fracture 2450.50 2450.60 0
2011-03-27 Multi-Stage Fracture 2387.30 2387.40 0
2011-03-27 Multi-Stage Fracture 2312.30 2312.40 0
2011-03-27 Multi-Stage Fracture 2249.00 2249.10 0
2011-03-26 Multi-Stage Fracture 3359.70 3359.80 0
2011-03-27 Multi-Stage Fracture 2185.70 2185.80 0
2011-03-27 Multi-Stage Fracture 2122.60 2122.70 0
2011-03-26 Multi-Stage Fracture 3284.60 3284.70 0
2011-03-26 Multi-Stage Fracture 3232.90 3233.00 0
2011-03-26 Multi-Stage Fracture 3158.00 3158.10 0
2011-03-26 Multi-Stage Fracture 3094.60 3094.70 0
2011-03-26 Multi-Stage Fracture 3031.50 3031.60 0
2011-03-27 Multi-Stage Fracture 2968.10 2968.20 0
2011-03-27 Multi-Stage Fracture 2904.80 2904.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3221 0.0 0.0 0.0
2012 8493 0.0 0.0 0.0
2013 8245 0.0 0.0 0.0
2014 8586 0.0 0.0 0.0
2015 7219 0.0 0.0 0.0
2016 8742 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8751 0.0 0.0 0.0
2019 8515 0.0 0.0 0.0
2020 2066 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-30 Lost Circulation 99.00 270.00

For data sources see[7]

References