If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515120309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.389718,"lon":-115.673986,"icon":""}]} |
Location: 00/09-03-051-12W5/0 | |
Location Alias: 00/09-03-51-12 W5M | |
Location Alias 2: 00/09-03-051-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: BACCALIEU HZ PEMBINA 9-3-51-12 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0423563 | |
License Date: 2010-09-16 | |
License Status: Amended | |
Spud Date: 2010-11-07 | |
Final Drill Date: 2010-11-21 | |
Well Total Depth: 3208.00 m | |
Surface Hole Latitude: 53.389718 | |
Surface Hole Longitude: -115.673986 |
Date | Event |
---|---|
2010-09-16 | Obtained License |
2010-11-08 | Surface Casing Operation Performed |
2010-11-10 | Direction Drilling Operation Performed - Horizontal |
2010-11-13 | Intermediate Casing Operation Performed |
2010-11-13 | Well Log Performed |
2010-11-21 | Finished Drilling |
2010-11-21 | Well Log Performed |
2010-11-21 | Well Mode changed to Drilled and Cased |
2010-11-25 | Liner Casing Operation Performed |
2010-11-25 | Perforation Treatment Performed - Open-Hole Completion |
2010-11-26 | Rig Released |
2010-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-01-02 | Well Began Production |
2011-01-02 | Well Fluid changed to Crude Oil |
2011-01-02 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-10 | 1499.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-25 | Open Hole/Barefoot Completion | 2755.00 | 3208.00 | 0 |
2010-12-03 | Multi-Stage Fracture | 1731.60 | 2699.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8216 | 0.0 | 0.0 | 0.0 |
2012 | 8528 | 0.0 | 0.0 | 0.0 |
2013 | 8022 | 0.0 | 0.0 | 0.0 |
2014 | 8289 | 0.0 | 0.0 | 0.0 |
2015 | 8517 | 0.0 | 0.0 | 0.0 |
2016 | 8651 | 0.0 | 0.0 | 0.0 |
2017 | 8524 | 0.0 | 0.0 | 0.0 |
2018 | 8596 | 0.0 | 0.0 | 0.0 |
2019 | 8588 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]