X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515113004020

Well Details

Well ID: 0515113004020
Loading map...
Location: 02/04-30-051-11W5/0
Location Alias: 02/04-30-51-11 W5M
Location Alias 2: 02/04-30-051-11 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 11
Section: 30
County/Municipality: Yellowhead County
Well Name: ANDERSON 102 HZ CYN-PEM 4-30-51-11
Operator Name: InPlay Oil Corp.
License Number: 0437923
License Date: 2011-10-21
License Status: Issued
Spud Date: 2011-11-02
Final Drill Date: 2011-11-12
Well Total Depth: 3327.00 m
Surface Hole Latitude: 53.429443
Surface Hole Longitude: -115.596955

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2011-11-04 Surface Casing Operation Performed
2011-11-06 Well Log Performed
2011-11-07 Direction Drilling Operation Performed - Horizontal
2011-11-12 Finished Drilling
2011-11-12 Well Mode changed to Drilled and Cased
2011-11-14 Production Casing Operation Performed
2011-11-14 Rig Released
2011-11-30 Well Log Performed
2011-12-12 Perforation Treatment Performed - Jet Perforation
2011-12-13 Perforation Treatment Performed - Jet Perforation
2011-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Well Began Production
2011-12-15 Well Fluid changed to Crude Oil
2011-12-15 Well Log Performed
2011-12-15 Well Mode changed to Flowing
2011-12-17 Well Fluid changed to Crude Oil
2011-12-17 Well Mode changed to Pumping
2011-12-31 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-07 1239.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-12 Perforation 3224.00 3224.50 3
2011-12-13 Multi-Stage Fracture 3018.00 3018.50 0
2011-12-13 Multi-Stage Fracture 2948.00 2948.50 0
2011-12-13 Multi-Stage Fracture 2890.00 2890.50 0
2011-12-13 Perforation 2813.00 2813.50 3
2011-12-13 Perforation 2743.00 2743.50 3
2011-12-13 Perforation 2673.00 2673.50 3
2011-12-13 Perforation 2590.00 2590.50 3
2011-12-13 Perforation 2527.00 2527.50 3
2011-12-13 Perforation 2466.00 2466.50 3
2011-12-13 Multi-Stage Fracture 2813.00 2813.50 0
2011-12-12 Perforation 3154.00 3154.50 3
2011-12-13 Multi-Stage Fracture 2743.00 2743.50 0
2011-12-13 Multi-Stage Fracture 2590.00 2590.50 0
2011-12-13 Multi-Stage Fracture 2527.00 2527.50 0
2011-12-13 Multi-Stage Fracture 2466.00 2466.50 0
2011-12-13 Perforation 2390.00 2390.50 3
2011-12-13 Perforation 2317.00 2317.50 3
2011-12-13 Perforation 2252.00 2252.50 3
2011-12-13 Perforation 2182.00 2182.50 3
2011-12-13 Perforation 2112.00 2112.50 3
2011-12-13 Perforation 2044.00 2044.50 3
2011-12-12 Perforation 3086.00 3086.50 3
2011-12-13 Perforation 1982.00 1982.50 3
2011-12-13 Multi-Stage Fracture 2390.00 2390.50 0
2011-12-13 Multi-Stage Fracture 2317.00 2317.50 0
2011-12-13 Multi-Stage Fracture 2252.00 2252.50 0
2011-12-13 Multi-Stage Fracture 2182.00 2182.50 0
2011-12-13 Multi-Stage Fracture 2112.00 2112.50 0
2011-12-13 Multi-Stage Fracture 2044.00 2044.50 0
2011-12-13 Multi-Stage Fracture 1982.00 1982.50 0
2011-12-12 Perforation 3018.00 3018.50 3
2011-12-12 Perforation 2948.00 2948.50 3
2011-12-12 Perforation 2890.00 2890.50 3
2011-12-13 Multi-Stage Fracture 3224.00 3224.50 0
2011-12-13 Multi-Stage Fracture 3154.00 3154.50 0
2011-12-13 Multi-Stage Fracture 3086.00 3086.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 336 0.0 0.0 0.0
2012 8012 0.0 0.0 0.0
2013 7901 0.0 0.0 0.0
2014 7968 0.0 0.0 0.0
2015 7605 0.0 0.0 0.0
2016 7870 0.0 0.0 0.0
2017 7808 0.0 0.0 0.0
2018 8258 0.0 0.0 0.0
2019 8283 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[6]

References