If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515113004020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.429443,"lon":-115.596955,"icon":""}]} |
Location: 02/04-30-051-11W5/0 | |
Location Alias: 02/04-30-51-11 W5M | |
Location Alias 2: 02/04-30-051-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 11 | |
Section: 30 | |
County/Municipality: Yellowhead County | |
Well Name: ANDERSON 102 HZ CYN-PEM 4-30-51-11 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0437923 | |
License Date: 2011-10-21 | |
License Status: Issued | |
Spud Date: 2011-11-02 | |
Final Drill Date: 2011-11-12 | |
Well Total Depth: 3327.00 m | |
Surface Hole Latitude: 53.429443 | |
Surface Hole Longitude: -115.596955 |
Date | Event |
---|---|
2011-10-21 | Obtained License |
2011-11-04 | Surface Casing Operation Performed |
2011-11-06 | Well Log Performed |
2011-11-07 | Direction Drilling Operation Performed - Horizontal |
2011-11-12 | Finished Drilling |
2011-11-12 | Well Mode changed to Drilled and Cased |
2011-11-14 | Production Casing Operation Performed |
2011-11-14 | Rig Released |
2011-11-30 | Well Log Performed |
2011-12-12 | Perforation Treatment Performed - Jet Perforation |
2011-12-13 | Perforation Treatment Performed - Jet Perforation |
2011-12-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-15 | Well Began Production |
2011-12-15 | Well Fluid changed to Crude Oil |
2011-12-15 | Well Log Performed |
2011-12-15 | Well Mode changed to Flowing |
2011-12-17 | Well Fluid changed to Crude Oil |
2011-12-17 | Well Mode changed to Pumping |
2011-12-31 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-07 | 1239.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-12 | Perforation | 3224.00 | 3224.50 | 3 |
2011-12-13 | Multi-Stage Fracture | 3018.00 | 3018.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2948.00 | 2948.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2890.00 | 2890.50 | 0 |
2011-12-13 | Perforation | 2813.00 | 2813.50 | 3 |
2011-12-13 | Perforation | 2743.00 | 2743.50 | 3 |
2011-12-13 | Perforation | 2673.00 | 2673.50 | 3 |
2011-12-13 | Perforation | 2590.00 | 2590.50 | 3 |
2011-12-13 | Perforation | 2527.00 | 2527.50 | 3 |
2011-12-13 | Perforation | 2466.00 | 2466.50 | 3 |
2011-12-13 | Multi-Stage Fracture | 2813.00 | 2813.50 | 0 |
2011-12-12 | Perforation | 3154.00 | 3154.50 | 3 |
2011-12-13 | Multi-Stage Fracture | 2743.00 | 2743.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2590.00 | 2590.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2527.00 | 2527.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2466.00 | 2466.50 | 0 |
2011-12-13 | Perforation | 2390.00 | 2390.50 | 3 |
2011-12-13 | Perforation | 2317.00 | 2317.50 | 3 |
2011-12-13 | Perforation | 2252.00 | 2252.50 | 3 |
2011-12-13 | Perforation | 2182.00 | 2182.50 | 3 |
2011-12-13 | Perforation | 2112.00 | 2112.50 | 3 |
2011-12-13 | Perforation | 2044.00 | 2044.50 | 3 |
2011-12-12 | Perforation | 3086.00 | 3086.50 | 3 |
2011-12-13 | Perforation | 1982.00 | 1982.50 | 3 |
2011-12-13 | Multi-Stage Fracture | 2390.00 | 2390.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2317.00 | 2317.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2252.00 | 2252.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2182.00 | 2182.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2112.00 | 2112.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 2044.00 | 2044.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 1982.00 | 1982.50 | 0 |
2011-12-12 | Perforation | 3018.00 | 3018.50 | 3 |
2011-12-12 | Perforation | 2948.00 | 2948.50 | 3 |
2011-12-12 | Perforation | 2890.00 | 2890.50 | 3 |
2011-12-13 | Multi-Stage Fracture | 3224.00 | 3224.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 3154.00 | 3154.50 | 0 |
2011-12-13 | Multi-Stage Fracture | 3086.00 | 3086.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 336 | 0.0 | 0.0 | 0.0 |
2012 | 8012 | 0.0 | 0.0 | 0.0 |
2013 | 7901 | 0.0 | 0.0 | 0.0 |
2014 | 7968 | 0.0 | 0.0 | 0.0 |
2015 | 7605 | 0.0 | 0.0 | 0.0 |
2016 | 7870 | 0.0 | 0.0 | 0.0 |
2017 | 7808 | 0.0 | 0.0 | 0.0 |
2018 | 8258 | 0.0 | 0.0 | 0.0 |
2019 | 8283 | 0.0 | 0.0 | 0.0 |
2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[6]