X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515111915000

Well Details

Well ID: 0515111915000
Loading map...
Location: 00/15-19-051-11W5/0
Location Alias: 00/15-19-51-11 W5M
Location Alias 2: 00/15-19-051-11 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 11
Section: 19
County/Municipality: Yellowhead County
Well Name: INPLAY OIL HZ PEMBINA 15-19-51-11
Operator Name: InPlay Oil Corp.
License Number: 0475660
License Date: 2015-06-04
License Status: Issued
Spud Date: 2015-07-28
Final Drill Date: 2015-08-05
Well Total Depth: 3394.00 m
Surface Hole Latitude: 53.408070
Surface Hole Longitude: -115.604335

For data sources see[1][2]

Well History

Date Event
2015-06-04 Obtained License
2015-07-29 Surface Casing Operation Performed
2015-07-31 Direction Drilling Operation Performed - Deviate
2015-08-01 Direction Drilling Operation Performed - Horizontal
2015-08-05 Finished Drilling
2015-08-05 Well Log Performed
2015-08-05 Well Mode changed to Drilled and Cased
2015-08-07 Production Casing Operation Performed
2015-08-08 Rig Released
2015-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-11 Well Log Performed
2015-10-24 Well Began Production
2015-10-24 Well Fluid changed to Crude Oil
2015-10-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-28 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-31 1296.40 Deviate (5 - 79 degrees)
2015-08-01 1944.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-07 Multi-Stage Fracture 3373.10 3373.30 0
2015-10-07 Multi-Stage Fracture 2735.70 2735.90 0
2015-10-07 Multi-Stage Fracture 2667.20 2667.40 0
2015-10-07 Multi-Stage Fracture 2519.20 2519.40 0
2015-10-07 Multi-Stage Fracture 2450.30 2450.50 0
2015-10-07 Multi-Stage Fracture 2381.60 2381.80 0
2015-10-07 Multi-Stage Fracture 2312.60 2312.80 0
2015-10-07 Multi-Stage Fracture 2243.90 2244.10 0
2015-10-07 Multi-Stage Fracture 2161.40 2161.60 0
2015-10-08 Multi-Stage Fracture 2092.30 2092.50 0
2015-10-08 Multi-Stage Fracture 2036.60 2036.80 0
2015-10-07 Multi-Stage Fracture 3297.60 3297.80 0
2015-10-07 Multi-Stage Fracture 3229.00 3229.20 0
2015-10-07 Multi-Stage Fracture 3160.20 3160.40 0
2015-10-07 Multi-Stage Fracture 3091.20 3091.40 0
2015-10-07 Multi-Stage Fracture 3022.40 3022.60 0
2015-10-07 Multi-Stage Fracture 2953.40 2953.60 0
2015-10-07 Multi-Stage Fracture 2884.70 2884.90 0
2015-10-07 Multi-Stage Fracture 2804.40 2804.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-07 2015-10-08 1,705 2,753 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.3093 N/A
water Not Available 100 85.2212 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.2756 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4321 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1593 N/A
non-hazardous ingredients Not Available 100 0.1593 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0208 N/A
propylene glycol 57-55-6 100 0.0208 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0899 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0899 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0899 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0784 N/A
aminofunctional polymer 8985 100 0.0784 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0784 N/A
isopropanol 67-63-0 100 0.0784 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-28 2015-10-07 Surface Water - River 2678

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1776 0.0 0.0 0.0
2016 8561 0.0 0.0 0.0
2017 8665 0.0 0.0 0.0
2018 8558 0.0 0.0 0.0
2019 8463 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-08 No Incident Encountered 0.00 0.00
2015-10-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References