X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515102007000

Well Details

Well ID: 0515102007000
Loading map...
Location: 00/07-20-051-10W5/0
Location Alias: 00/07-20-51-10 W5M
Location Alias 2: 00/07-20-051-10 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 10
Section: 20
County/Municipality: Yellowhead County
Well Name: AMOCO CYN-PEM 7-20-51-10
Operator Name: BP Canada Energy Group ULC
License Number: 0083915
License Date: 1980-07-04
License Status: RecCertified
Spud Date: 1980-07-23
Final Drill Date: 1980-08-15
Well Total Depth: 2140.00 m
Surface Hole Latitude: 53.414718
Surface Hole Longitude: -115.434068

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-04 Obtained License
1980-07-22 Lost Circulation Occurred
1980-07-23 Lost Circulation Occurred
1980-08-15 Finished Drilling
1980-08-18 Production Casing Operation Performed
1980-09-27 Perforation Treatment Performed - Jet Perforation
1980-09-28 Perforation Treatment Performed - Fractured
1980-10-06 Well Mode changed to Drilled and Cased
1982-04-01 Well Began Production
1982-04-01 Well Fluid changed to Crude Oil
1982-04-01 Well Mode changed to Flowing
1982-08-15 Well Fluid changed to Crude Oil
1982-08-15 Well Mode changed to Suspended
1982-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-20 Perforation Treatment Performed - Jet Perforation
1982-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-13 Perforation Treatment Performed - Cement Squeeze
1982-09-17 Perforation Treatment Performed - Jet Perforation
1982-09-19 Perforation Treatment Performed - Cement Squeeze
1986-07-09 Well Abandoned
1986-07-09 Well Fluid changed to Crude Oil
1986-07-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-27 Perforation 2103.00 2110.00 13
1980-09-28 Fracture 2103.00 2110.00 0
1982-08-18 Packing Device Capped w/Cement 2101.00 2102.00 0
1982-08-20 Perforation 2083.00 2085.00 14
1982-09-13 Acid Treatment 2083.00 2085.00 0
1982-09-13 Cement Squeeze 2083.00 2085.00 0
1982-09-17 Perforation 2088.00 2095.00 13
1982-09-19 Cement Squeeze 2088.00 2095.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2691 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-22 Lost Circulation 21.00 21.00
1980-07-23 Lost Circulation 70.00 70.00

For data sources see[6]

References