X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515090406000

Well Details

Well ID: 0515090406000
Loading map...
Location: 00/06-04-051-09W5/0
Location Alias: 00/06-04-51-09 W5M
Location Alias 2: 00/06-04-051-09 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 09
Section: 04
County/Municipality: Yellowhead County
Well Name: HUBER N PEMBINA 6-4-51-9
Operator Name: J. M. Huber Corporation
License Number: 0061120
License Date: 1976-11-12
License Status: Re-Entered
Spud Date: 1976-11-19
Final Drill Date: 1976-12-20
Well Total Depth: 2194.60 m
Surface Hole Latitude: 53.367851
Surface Hole Longitude: -115.277442

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-12 Obtained License
1976-11-19 Direction Drilling Operation Performed - 98
1976-11-19 Lost Circulation Occurred
1976-12-20 Finished Drilling
1976-12-30 Production Casing Operation Performed
1977-02-03 Perforation Treatment Performed - Jet Perforation
1977-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-02-08 Perforation Treatment Performed - Jet Perforation
1977-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-02-13 Perforation Treatment Performed - Jet Perforation
1977-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-19 Perforation Treatment Performed - Jet Perforation
1977-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-02-22 Well Mode changed to Drilled and Cased
1982-03-25 Well Mode changed to Abandoned
1982-03-26 Well Abandoned
1982-03-26 Well Mode changed to Abandoned and Re-entered

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1976-11-19 853.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-03 Perforation 2129.90 2130.60 7
1977-02-19 Perforation 1991.60 1993.40 7
1977-02-19 Acid Treatment 1991.60 1993.40 0
1977-02-22 Packing Device Capped w/Cement 1978.50 1986.10 0
1977-02-04 Acid Treatment 2129.90 2130.60 0
1977-02-08 Packing Device Capped w/Cement 2121.10 2128.70 0
1977-02-08 Perforation 2079.30 2081.80 7
1977-02-08 Perforation 2085.70 2087.30 7
1977-02-09 Acid Treatment 2079.30 2087.30 0
1977-02-13 Packing Device Capped w/Cement 2069.30 2076.90 0
1977-02-13 Perforation 2044.00 2056.20 3
1977-02-15 Acid Treatment 2044.00 2056.20 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-11-19 Lost Circulation 21.30 21.30

For data sources see[6]

References