If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0514273505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.44842,"lon":-113.882203,"icon":""}]} |
| Location: 00/05-35-051-27W4/0 | |
| Location Alias: 00/05-35-51-27 W4M | |
| Location Alias 2: 00/05-35-051-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 35 | |
| County/Municipality: Parkland County | |
| Well Name: CEDAR CREEK GSPIKE 5-35-51-27 | |
| Operator Name: MAGA Energy Operations Ltd. | |
| License Number: 0215948 | |
| License Date: 1998-06-17 | |
| License Status: Issued | |
| Spud Date: 1998-06-20 | |
| Final Drill Date: 1998-07-02 | |
| Well Total Depth: 1874.80 m | |
| Surface Hole Latitude: 53.448420 | |
| Surface Hole Longitude: -113.882203 |
| Date | Event |
|---|---|
| 1998-06-17 | Obtained License |
| 1998-06-21 | Surface Casing Operation Performed |
| 1998-06-22 | Direction Drilling Operation Performed - Deviate |
| 1998-07-02 | Finished Drilling |
| 1998-07-02 | Well Mode changed to Drilled and Cased |
| 1998-07-03 | Well Log Performed |
| 1998-07-04 | Production Casing Operation Performed |
| 1998-07-04 | Rig Released |
| 1998-07-05 | Well Log Performed |
| 1998-07-06 | Well Log Performed |
| 1998-07-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1998-07-10 | Well Log Performed |
| 1998-09-18 | Well Began Production |
| 1998-09-18 | Well Fluid changed to Crude Oil |
| 1998-09-18 | Well Mode changed to Pumping |
| 1998-10-30 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-30 | Well Log Performed |
| 1998-11-04 | Well Fluid changed to Crude Oil |
| 1998-11-04 | Well Mode changed to Pumping |
| 1998-11-26 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-26 | Well Log Performed |
| 1999-04-07 | Perforation Treatment Performed - Cement Squeeze |
| 1999-04-07 | Well Fluid changed to Crude Oil |
| 1999-04-07 | Well Mode changed to Pumping |
| 1999-04-13 | Perforation Treatment Performed - Jet Perforation |
| 1999-04-13 | Well Log Performed |
| 1999-04-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-04-17 | Well Fluid changed to Crude Oil |
| 1999-04-17 | Well Mode changed to Pumping |
| 2000-09-29 | Perforation Treatment Performed - Cement Squeeze |
| 2000-09-29 | Plug Back Performed |
| 2000-09-29 | Well Fluid changed to Crude Oil |
| 2000-09-29 | Well Log Performed |
| 2000-09-29 | Well Mode changed to Pumping |
| 2000-10-03 | Perforation Treatment Performed - Jet Perforation |
| 2000-10-03 | Well Log Performed |
| 2004-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-05-13 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1998-06-22 | 215.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1998-07-10 | Open Hole/Barefoot Completion | 1873.00 | 1874.00 | 0 |
| 2009-05-13 | Chemical Squeeze | 1871.40 | 1874.80 | 0 |
| 1998-10-30 | Perforation | 1358.50 | 1360.00 | 14 |
| 1998-11-26 | Perforation | 1370.20 | 1371.20 | 17 |
| 1999-04-07 | Cement Squeeze | 1358.50 | 1360.00 | 0 |
| 1999-04-13 | Perforation | 1370.20 | 1373.70 | 14 |
| 1999-04-15 | Acid Treatment | 1370.20 | 1373.70 | 0 |
| 2000-09-29 | Cement Squeeze | 1370.20 | 1373.70 | 0 |
| 2000-10-03 | Perforation | 1871.40 | 1874.40 | 14 |
| 2004-03-06 | Acid Treatment | 1870.80 | 1874.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1998 | 2035 | 0.0 | 0.0 | 0.0 |
| 1999 | 7679 | 0.0 | 0.0 | 0.0 |
| 2000 | 7702 | 0.0 | 0.0 | 0.0 |
| 2001 | 8015 | 0.0 | 0.0 | 0.0 |
| 2002 | 8496 | 0.0 | 0.0 | 0.0 |
| 2003 | 7786 | 0.0 | 0.0 | 0.0 |
| 2004 | 7712 | 0.0 | 0.0 | 0.0 |
| 2005 | 6768 | 0.0 | 0.0 | 0.0 |
| 2006 | 7788 | 0.0 | 0.0 | 0.0 |
| 2007 | 8003 | 0.0 | 0.0 | 0.0 |
| 2008 | 7479 | 0.0 | 0.0 | 0.0 |
| 2009 | 6251 | 0.0 | 0.0 | 0.0 |
| 2010 | 8201 | 0.0 | 0.0 | 0.0 |
| 2011 | 8163 | 0.0 | 0.0 | 0.0 |
| 2012 | 7524 | 0.0 | 0.0 | 0.0 |
| 2013 | 8619 | 0.0 | 0.0 | 0.0 |
| 2014 | 8250 | 0.0 | 0.0 | 0.0 |
| 2015 | 8367 | 0.0 | 0.0 | 0.0 |
| 2016 | 5208 | 0.0 | 0.0 | 0.0 |
| 2017 | 7664 | 0.0 | 0.0 | 0.0 |
| 2018 | 8729 | 0.0 | 0.0 | 0.0 |
| 2019 | 8295 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]