X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272216050

Well Details

Well ID: 0514272216050
Loading map...
Location: 05/16-22-051-27W4/0
Location Alias: 05/16-22-51-27 W4M
Location Alias 2: 05/16-22-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 22
County/Municipality: Parkland County
Well Name: ESSO GOLDEN SPIKE 16D-22-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0074715
License Date: 1979-03-01
License Status: Abandoned
Spud Date: 1979-09-09
Final Drill Date: 1979-10-08
Well Total Depth: 1860.00 m
Surface Hole Latitude: 53.424190
Surface Hole Longitude: -113.890293

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-01 Obtained License
1979-09-09 Direction Drilling Operation Performed - 98
1979-10-08 Finished Drilling
1979-10-08 Well Mode changed to Drilled and Cased
1979-10-09 Well Log Performed
1979-10-10 Liner Casing Operation Performed
1979-10-25 Perforation Treatment Performed - Jet Perforation
1979-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-13 Well Began Production
1979-11-13 Well Fluid changed to Crude Oil
1979-11-13 Well Mode changed to Gas Lift
1992-03-18 Perforation Treatment Performed - Jet Perforation
1992-03-18 Well Log Performed
1992-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2008-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-03 Plug Back Performed
2008-10-03 Well Fluid changed to Crude Oil
2008-10-03 Well Mode changed to Abandoned Zone
2008-10-04 Perforation Treatment Performed - Jet Perforation
2008-10-04 Well Log Performed
2008-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-05 Perforation Treatment Performed - Remedial Casing
2011-08-31 Well Abandoned
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-09-09 206.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-25 Perforation 1840.00 1845.00 6
1979-10-26 Acid Treatment 1840.00 1845.00 0
1992-03-18 Perforation 1841.00 1849.00 14
1992-03-20 Acid Treatment 1840.00 1849.00 0
2008-10-03 Packing Device Capped w/Cement 1250.00 1830.00 0
2008-10-04 Perforation 221.00 222.00 17
2008-10-05 Remedial Casing Cementing 221.00 222.00 0
2008-10-05 Packing Device Capped w/Cement 180.00 210.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1345 0.0 0.0 0.0
1980 5687 0.0 0.0 0.0
1981 8054 0.0 0.0 0.0
1982 8588 0.0 0.0 0.0
1983 8625 0.0 0.0 0.0
1984 8625 0.0 0.0 0.0
1985 8215 0.0 0.0 0.0
1986 8079 0.0 0.0 0.0
1987 8585 0.0 0.0 0.0
1988 8528 0.0 0.0 0.0
1989 8228 0.0 0.0 0.0
1990 8641 0.0 0.0 0.0
1991 8342 0.0 0.0 0.0
1992 5030 0.0 0.0 0.0
1993 6420 0.0 0.0 0.0
1994 8598 0.0 0.0 0.0
1995 8647 0.0 0.0 0.0
1996 8734 0.0 0.0 0.0
1997 8593 0.0 0.0 0.0
1998 8699 0.0 0.0 0.0
1999 8434 0.0 0.0 0.0
2000 8760 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 2831 0.0 0.0 0.0

For data sources see[6]

References