X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272209000

Well Details

Well ID: 0514272209000
Loading map...
Location: 00/09-22-051-27W4/0
Location Alias: 00/09-22-51-27 W4M
Location Alias 2: 00/09-22-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 22
County/Municipality: Parkland County
Well Name: IMPERIAL SCHOEPP NO. 1
Operator Name: Imperial Oil Resources Limited
License Number: B0002456
License Date: 1948-11-05
License Status: Abandoned
Spud Date: 1948-11-25
Final Drill Date: 1949-04-12
Well Total Depth: 1853.80 m
Surface Hole Latitude: 53.419379
Surface Hole Longitude: -113.888782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-11-05 Obtained License
1948-12-17 Drill Stem Test Performed
1948-12-27 Drill Stem Test Performed
1948-12-31 Drill Stem Test Performed
1949-01-03 Drill Stem Test Performed
1949-01-04 Drill Stem Test Performed
1949-01-06 Drill Stem Test Performed
1949-01-08 Drill Stem Test Performed
1949-01-10 Drill Stem Test Performed
1949-01-11 Drill Stem Test Performed
1949-01-12 Drill Stem Test Performed
1949-01-13 Drill Stem Test Performed
1949-01-16 Drill Stem Test Performed
1949-01-25 Drill Stem Test Performed
1949-01-26 Drill Stem Test Performed
1949-01-29 Drill Stem Test Performed
1949-01-30 Drill Stem Test Performed
1949-01-31 Drill Stem Test Performed
1949-02-01 Drill Stem Test Performed
1949-02-03 Drill Stem Test Performed
1949-02-04 Drill Stem Test Performed
1949-02-09 Drill Stem Test Performed
1949-02-12 Liner Casing Operation Performed
1949-02-16 Drill Stem Test Performed
1949-02-17 Drill Stem Test Performed
1949-02-18 Drill Stem Test Performed
1949-02-19 Drill Stem Test Performed
1949-02-20 Drill Stem Test Performed
1949-02-21 Drill Stem Test Performed
1949-02-22 Drill Stem Test Performed
1949-02-23 Drill Stem Test Performed
1949-02-24 Drill Stem Test Performed
1949-02-25 Drill Stem Test Performed
1949-02-26 Drill Stem Test Performed
1949-02-27 Drill Stem Test Performed
1949-02-28 Drill Stem Test Performed
1949-03-02 Drill Stem Test Performed
1949-03-03 Drill Stem Test Performed
1949-03-04 Drill Stem Test Performed
1949-03-05 Drill Stem Test Performed
1949-03-06 Drill Stem Test Performed
1949-03-07 Drill Stem Test Performed
1949-03-08 Drill Stem Test Performed
1949-03-09 Drill Stem Test Performed
1949-03-10 Drill Stem Test Performed
1949-03-12 Drill Stem Test Performed
1949-03-13 Drill Stem Test Performed
1949-03-14 Drill Stem Test Performed
1949-03-15 Drill Stem Test Performed
1949-03-16 Drill Stem Test Performed
1949-03-17 Drill Stem Test Performed
1949-03-18 Drill Stem Test Performed
1949-03-19 Drill Stem Test Performed
1949-03-20 Drill Stem Test Performed
1949-03-21 Drill Stem Test Performed
1949-03-22 Drill Stem Test Performed
1949-03-23 Drill Stem Test Performed
1949-03-24 Drill Stem Test Performed
1949-03-25 Drill Stem Test Performed
1949-03-26 Drill Stem Test Performed
1949-03-27 Drill Stem Test Performed
1949-03-28 Drill Stem Test Performed
1949-03-29 Drill Stem Test Performed
1949-03-30 Drill Stem Test Performed
1949-03-31 Drill Stem Test Performed
1949-04-01 Drill Stem Test Performed
1949-04-02 Drill Stem Test Performed
1949-04-03 Drill Stem Test Performed
1949-04-04 Drill Stem Test Performed
1949-04-05 Drill Stem Test Performed
1949-04-06 Drill Stem Test Performed
1949-04-07 Drill Stem Test Performed
1949-04-08 Drill Stem Test Performed
1949-04-09 Drill Stem Test Performed
1949-04-10 Drill Stem Test Performed
1949-04-11 Drill Stem Test Performed
1949-04-12 Drill Stem Test Performed
1949-04-12 Finished Drilling
1949-04-12 Well Mode changed to Drilled and Cased
1949-04-13 Drill Stem Test Performed
1949-04-13 Perforation Treatment Performed - Open-Hole Completion
1949-04-18 Well Began Production
1949-04-18 Well Fluid changed to Crude Oil
1949-04-18 Well Mode changed to Flowing
1955-06-28 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-01 Perforation Treatment Performed - Acid Wash - No Pressure
1957-09-06 Perforation Treatment Performed - Acid Wash - No Pressure
1964-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-07 Perforation Treatment Performed - Open-Hole Completion
1970-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-09 Perforation Treatment Performed - Cement Squeeze
1977-09-14 Perforation Treatment Performed - Cement Squeeze
1977-09-16 Perforation Treatment Performed - Jet Perforation
1977-09-19 Perforation Treatment Performed - Cement Squeeze
1977-09-20 Perforation Treatment Performed - Cement Squeeze
1977-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2010-10-21 Well Log Performed
2010-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-22 Perforation Treatment Performed - Jet Perforation
2010-10-22 Plug Back Performed
2010-10-22 Well Fluid changed to Crude Oil
2010-10-22 Well Log Performed
2010-10-22 Well Mode changed to Abandoned Zone
2010-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-24 Perforation Treatment Performed - Jet Perforation
2010-10-24 Perforation Treatment Performed - Remedial Casing
2010-10-24 Well Log Performed
2010-10-25 Perforation Treatment Performed - Remedial Casing
2010-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-26 Perforation Treatment Performed - Jet Perforation
2010-10-26 Well Log Performed
2010-10-27 Perforation Treatment Performed - Cement Plug
2010-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-03 Perforation Treatment Performed - Jet Perforation
2010-11-03 Well Log Performed
2010-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-04 Perforation Treatment Performed - Cement Plug
2015-06-24 Well Abandoned
2015-06-24 Well Fluid changed to Crude Oil
2015-06-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-13 Open Hole/Barefoot Completion 1634.60 1815.40 0
1964-12-07 Open Hole/Barefoot Completion 1710.50 1815.40 0
1970-09-01 Acid Treatment 1758.70 1767.80 0
1970-09-01 Acid Treatment 1767.80 1815.40 0
1977-09-09 Cement Squeeze 1784.30 1795.90 0
1977-09-14 Cement Squeeze 1784.30 1795.90 0
1977-09-16 Perforation 1799.50 1805.00 7
1977-09-19 Cement Squeeze 1784.30 1795.90 0
1977-09-20 Cement Squeeze 1784.30 1795.90 0
1977-09-27 Acid Treatment 1799.50 1805.00 0
2010-10-22 Packing Device Capped w/Cement 1225.00 1623.00 0
1955-06-28 Acid Wash 1634.60 1815.40 0
2010-10-22 Perforation 1087.00 1088.00 17
2010-10-24 Remedial Casing Cementing 1087.00 1088.00 0
2010-10-24 Packing Device Capped w/Cement 1070.00 1080.00 0
2010-10-24 Perforation 587.00 588.00 17
2010-10-25 Remedial Casing Cementing 587.00 588.00 0
2010-10-26 Packing Device Capped w/Cement 570.00 579.50 0
2010-10-26 Perforation 459.00 460.00 17
2010-10-26 Perforation 440.00 441.00 17
2010-10-26 Perforation 409.00 410.00 17
2010-10-26 Perforation 324.00 325.00 17
1955-08-01 Acid Wash 1634.60 1815.40 0
2010-10-26 Perforation 307.00 308.00 17
2010-10-27 Cement Plug 307.00 570.00 0
2010-11-03 Packing Device Capped w/Cement 284.00 299.50 0
2010-11-03 Perforation 217.00 218.00 17
2010-11-03 Perforation 185.00 186.00 17
2010-11-04 Cement Plug 185.00 284.00 0
2010-11-04 Packing Device Capped w/Cement 164.00 174.50 0
1957-09-06 Acid Wash 1634.60 1815.40 0
1964-11-27 Acid Treatment 1706.90 1713.00 0
1964-11-27 Acid Treatment 1716.00 1722.10 0
1964-11-27 Acid Treatment 1725.20 1731.30 0
1964-11-27 Acid Treatment 1752.00 1758.10 0
1964-11-27 Acid Treatment 1781.90 1788.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1416 0.0 0.0 0.0
1969 7883 0.0 0.0 0.0
1970 7974 0.0 0.0 0.0
1971 7997 0.0 0.0 0.0
1972 8282 0.0 0.0 0.0
1973 5892 0.0 0.0 0.0
1974 5956 0.0 0.0 0.0
1975 5628 0.0 0.0 0.0
1976 2559 0.0 0.0 0.0
1977 2750 0.0 0.0 0.0
1978 3028 0.0 0.0 0.0
1979 1515 0.0 0.0 0.0
1980 2124 0.0 0.0 0.0
1981 5710 0.0 0.0 0.0
1982 7638 0.0 0.0 0.0
1983 8422 0.0 0.0 0.0
1984 8601 0.0 0.0 0.0
1985 8214 0.0 0.0 0.0
1986 7969 0.0 0.0 0.0
1987 8585 0.0 0.0 0.0
1988 7811 0.0 0.0 0.0
1989 8221 0.0 0.0 0.0
1990 8626 0.0 0.0 0.0
1991 8156 0.0 0.0 0.0
1992 2436 0.0 0.0 0.0
1993 244 0.0 0.0 0.0
1994 286 0.0 0.0 0.0
1995 3224 0.0 0.0 0.0
1996 7591 0.0 0.0 0.0
1997 7053 0.0 0.0 0.0
1998 4868 0.0 0.0 0.0
1999 5610 0.0 0.0 0.0
2000 8691 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 2160 0.0 0.0 0.0

For data sources see[5]

References