If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514260509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.376162,"lon":-113.79073,"icon":""}]} |
Location: 00/09-05-051-26W4/0 | |
Location Alias: 00/09-05-51-26 W4M | |
Location Alias 2: 00/09-05-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Parkland County | |
Well Name: IMPERIAL WOODBEND NO 24 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0000890 | |
License Date: 1949-11-16 | |
License Status: RecCertified | |
Spud Date: 1949-12-18 | |
Final Drill Date: 1950-01-29 | |
Well Total Depth: 1617.90 m | |
Surface Hole Latitude: 53.376162 | |
Surface Hole Longitude: -113.790730 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-11-16 | Obtained License |
1950-01-18 | Drill Stem Test Performed |
1950-01-21 | Drill Stem Test Performed |
1950-01-24 | Liner Casing Operation Performed |
1950-01-29 | Finished Drilling |
1950-01-29 | Well Mode changed to Drilled and Cased |
1950-02-02 | Perforation Treatment Performed - Bullet Perforation |
1950-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1950-02-03 | Well Began Production |
1950-02-03 | Well Fluid changed to Crude Oil |
1950-02-03 | Well Mode changed to Flowing |
1974-03-26 | Well Fluid changed to Crude Oil |
1974-03-26 | Well Mode changed to Pumping |
1985-01-10 | Perforation Treatment Performed - Cement Squeeze |
1985-01-14 | Well Log Performed |
1985-01-15 | Perforation Treatment Performed - Jet Perforation |
1985-06-18 | Perforation Treatment Performed - Cement Squeeze |
1985-06-20 | Well Log Performed |
1985-06-21 | Perforation Treatment Performed - Jet Perforation |
1985-06-21 | Well Log Performed |
1991-09-22 | Well Fluid changed to Crude Oil |
1991-09-22 | Well Mode changed to Suspended |
1996-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-26 | Perforation Treatment Performed - Jet Perforation |
1996-06-26 | Perforation Treatment Performed - Remedial Casing |
1996-06-26 | Plug Back Performed |
1996-06-26 | Well Fluid changed to Crude Oil |
1996-06-26 | Well Log Performed |
1996-06-26 | Well Mode changed to Abandoned Zone |
1996-07-22 | Well Abandoned |
1996-07-22 | Well Fluid changed to Crude Oil |
1996-07-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-02-02 | Bullet Perforation | 1614.20 | 1615.70 | 20 |
1996-06-26 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1996-06-26 | Packing Device Capped w/Cement | 47.20 | 165.00 | 0 |
1950-02-03 | Acid Treatment | 1614.20 | 1615.70 | 0 |
1985-01-10 | Cement Squeeze | 1614.20 | 1615.70 | 0 |
1985-01-15 | Perforation | 1612.70 | 1612.80 | 2 |
1985-06-18 | Cement Squeeze | 1612.70 | 1612.80 | 0 |
1985-06-21 | Perforation | 1611.90 | 1612.00 | 2 |
1996-06-26 | Packing Device Capped w/Cement | 1568.00 | 1576.00 | 0 |
1996-06-26 | Packing Device Capped w/Cement | 1232.00 | 1240.00 | 0 |
1996-06-26 | Perforation | 160.00 | 161.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 2736 | 0.0 | 0.0 | 0.0 |
1969 | 3714 | 0.0 | 0.0 | 0.0 |
1970 | 5326 | 0.0 | 0.0 | 0.0 |
1971 | 6044 | 0.0 | 0.0 | 0.0 |
1972 | 2304 | 0.0 | 0.0 | 0.0 |
1973 | 5084 | 0.0 | 0.0 | 0.0 |
1974 | 6414 | 0.0 | 0.0 | 0.0 |
1975 | 8307 | 0.0 | 0.0 | 0.0 |
1976 | 8379 | 0.0 | 0.0 | 0.0 |
1977 | 8100 | 0.0 | 0.0 | 0.0 |
1978 | 8444 | 0.0 | 0.0 | 0.0 |
1979 | 8511 | 0.0 | 0.0 | 0.0 |
1980 | 8111 | 0.0 | 0.0 | 0.0 |
1981 | 6360 | 0.0 | 0.0 | 0.0 |
1982 | 8337 | 0.0 | 0.0 | 0.0 |
1983 | 8391 | 0.0 | 0.0 | 0.0 |
1984 | 7123 | 0.0 | 0.0 | 0.0 |
1985 | 6851 | 0.0 | 0.0 | 0.0 |
1986 | 6253 | 0.0 | 0.0 | 0.0 |
1987 | 8430 | 0.0 | 0.0 | 0.0 |
1988 | 8244 | 0.0 | 0.0 | 0.0 |
1989 | 6803 | 0.0 | 0.0 | 0.0 |
1990 | 8740 | 0.0 | 0.0 | 0.0 |
1991 | 5593 | 0.0 | 0.0 | 0.0 |
For data sources see[5]