X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514243110000

Well Details

Well ID: 0514243110000
Loading map...
Location: 00/10-31-051-24W4/0
Location Alias: 00/10-31-51-24 W4M
Location Alias 2: 00/10-31-051-24 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 24
Section: 31
County/Municipality: Edmonton
Well Name: C.P.R.L. ELLERSLIE NO. 1 WELL
Operator Name: Suncor Energy Inc.
License Number: 0001991
License Date: 1950-09-08
License Status: Re-Entered
Spud Date: 1950-09-16
Final Drill Date: 1950-11-14
Well Total Depth: 1624.60 m
Surface Hole Latitude: 53.449062
Surface Hole Longitude: -113.524680

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-08 Obtained License
1950-09-28 Drill Stem Test Performed
1950-10-02 Drill Stem Test Performed
1950-10-04 Drill Stem Test Performed
1950-10-05 Drill Stem Test Performed
1950-10-07 Drill Stem Test Performed
1950-10-10 Drill Stem Test Performed
1950-10-12 Production Casing Operation Performed
1950-10-22 Drill Stem Test Performed
1950-10-23 Drill Stem Test Performed
1950-10-25 Drill Stem Test Performed
1950-10-27 Drill Stem Test Performed
1950-11-01 Drill Stem Test Performed
1950-11-03 Drill Stem Test Performed
1950-11-14 Finished Drilling
1950-11-14 Well Mode changed to Drilled and Cased
1950-11-18 Perforation Treatment Performed - Bullet Perforation
1950-11-19 Perforation Treatment Performed - Cement Squeeze
1950-11-23 Perforation Treatment Performed - Bullet Perforation
1950-11-24 Perforation Treatment Performed - Selective Bullet Perforations
1950-11-25 Well Began Production
1950-11-25 Well Fluid changed to Crude Oil
1950-11-25 Well Mode changed to Flowing
1951-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1951-04-21 Perforation Treatment Performed - Cement Squeeze
1951-04-24 Perforation Treatment Performed - Selective Bullet Perforations
1951-04-25 Perforation Treatment Performed - Selective Bullet Perforations
1956-05-14 Well Fluid changed to Crude Oil
1956-05-14 Well Mode changed to Suspended
1959-04-30 Perforation Treatment Performed - Cement Squeeze
1959-04-30 Well Abandoned
1959-04-30 Well Fluid changed to Crude Oil
1959-04-30 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-18 Bullet Perforation 1197.90 1198.80 13
1951-04-25 Selective Bullet Perforations 1192.70 1192.70 0
1959-04-30 Cement Squeeze 1192.70 1193.00 0
1950-11-18 Bullet Perforation 1194.20 1195.10 13
1950-11-18 Bullet Perforation 1187.50 1188.40 13
1950-11-19 Cement Squeeze 1187.50 1198.80 0
1950-11-23 Bullet Perforation 1196.00 1196.30 16
1950-11-24 Selective Bullet Perforations 1192.70 1192.70 0
1951-04-18 Packing Device Capped w/Cement 1194.20 1194.20 0
1951-04-21 Cement Squeeze 1192.70 1192.70 0
1951-04-24 Selective Bullet Perforations 1193.00 1193.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References