X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514132516000

Well Details

Well ID: 0514132516000
Loading map...
Location: 00/16-25-051-13W4/0
Location Alias: 00/16-25-51-13 W4M
Location Alias 2: 00/16-25-051-13 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 13
Section: 25
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF PLAIN 16-25-51-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0081418
License Date: 1980-02-29
License Status: Abandoned
Spud Date: 1980-03-08
Final Drill Date: 1980-03-12
Well Total Depth: 800.00 m
Surface Hole Latitude: 53.436886
Surface Hole Longitude: -111.777360

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-29 Obtained License
1980-03-12 Finished Drilling
1980-03-12 Well Mode changed to Drilled and Cased
1980-03-13 Production Casing Operation Performed
1980-05-13 Perforation Treatment Performed - Jet Perforation
1980-05-14 Perforation Treatment Performed - Cement Squeeze
1980-05-21 Perforation Treatment Performed - Jet Perforation
1980-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-05-23 Perforation Treatment Performed - Jet Perforation
1980-05-24 Perforation Treatment Performed - Jet Perforation
1980-08-01 Well Began Production
1980-08-01 Well Fluid changed to Gas
1980-08-01 Well Mode changed to Flowing
1981-12-01 Well Fluid changed to Gas
1981-12-01 Well Mode changed to Flowing
1981-12-13 Perforation Treatment Performed - Jet Perforation
1988-03-08 Well Fluid changed to Gas
1988-03-08 Well Mode changed to Suspended
1994-02-02 Well Fluid changed to Gas
1994-02-02 Well Mode changed to Flowing
1994-04-22 Perforation Treatment Performed - Cement Plug
1994-04-22 Perforation Treatment Performed - Jet Perforation
1994-04-22 Plug Back Performed
1994-04-22 Well Fluid changed to Gas
1994-04-22 Well Mode changed to Abandoned Zone
1994-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-04-29 Plug Back Performed
1994-05-27 Perforation Treatment Performed - Fractured
1994-06-23 Well Log Performed
1995-07-26 Well Log Performed
1995-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-27 Plug Back Performed
1995-07-27 Well Log Performed
1995-07-28 Perforation Treatment Performed - Jet Perforation
1995-08-22 Well Log Performed
1995-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-23 Perforation Treatment Performed - Jet Perforation
1995-08-23 Plug Back Performed
2009-12-17 Perforation Treatment Performed - Cement Squeeze
2009-12-17 Plug Back Performed
2009-12-18 Well Log Performed
2010-01-04 Perforation Treatment Performed - Jet Perforation
2010-01-05 Perforation Treatment Performed - Remedial Casing
2010-01-06 Perforation Treatment Performed - Jet Perforation
2010-01-07 Perforation Treatment Performed - Remedial Casing
2010-01-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-13 Perforation 758.50 759.10 6
1981-12-13 Perforation 737.50 739.00 7
1994-04-22 Cement Plug 742.50 745.00 0
1994-04-22 Perforation 725.00 726.00 13
1994-04-22 Perforation 733.00 734.00 13
1994-04-22 Perforation 737.50 739.00 13
1994-04-27 Acid Treatment 725.00 739.00 0
1994-04-29 Packing Device Capped w/Cement 715.00 723.00 0
1994-04-29 Perforation 684.00 686.00 13
1994-05-27 Fracture 684.00 686.00 0
1995-07-27 Packing Device Capped w/Cement 672.00 680.00 0
1980-05-14 Cement Squeeze 758.50 759.10 0
1995-07-28 Perforation 647.00 648.50 13
1995-08-23 Packing Device Capped w/Cement 632.00 640.00 0
1995-08-23 Perforation 610.00 611.50 13
2009-12-17 Cement Squeeze 610.00 611.50 0
2010-01-04 Perforation 450.00 453.00 13
2010-01-05 Remedial Casing Cementing 450.00 453.00 0
2010-01-06 Perforation 215.00 216.00 20
2010-01-07 Remedial Casing Cementing 215.00 216.00 0
1980-05-21 Perforation 781.50 783.00 7
1980-05-22 Acid Treatment 781.50 783.00 0
1980-05-22 Packing Device Capped w/Cement 771.00 778.00 0
1980-05-23 Perforation 748.00 750.50 7
1980-05-24 Perforation 748.00 750.50 7
1981-12-13 Perforation 725.00 726.00 7
1981-12-13 Perforation 733.00 734.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2602 0.0 0.0 0.0
1981 7719 0.0 0.0 0.0
1982 7323 0.0 0.0 0.0
1983 5095 0.0 0.0 0.0
1984 7695 0.0 0.0 0.0
1985 4997 0.0 0.0 0.0
1986 1863 0.0 0.0 0.0
1987 894 0.0 0.0 0.0
1988 392 0.0 0.0 0.0
1990 289 0.0 0.0 0.0
1994 493 0.0 0.0 0.0

For data sources see[5]

References