X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514092914004

Well Details

Well ID: 0514092914004
Loading map...
Location: 00/14-29-051-09W4/4
Location Alias: 00/14-29-51-09 W4M
Location Alias 2: 00/14-29-051-09 W4/04
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 09
Section: 29
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 14-29-51-9
Operator Name: Perpetual Operating Corp.
License Number: 0143355
License Date: 1990-02-21
License Status: Suspension
Spud Date: 1990-02-27
Final Drill Date: 1990-03-01
Well Total Depth: 676.00 m
Surface Hole Latitude: 53.436772
Surface Hole Longitude: -111.297584

For data sources see[1][2]

Well History

Date Event
1990-02-21 Obtained License
1990-02-27 Surface Casing Operation Performed
1990-03-01 Finished Drilling
1990-03-01 Well Log Performed
1990-03-01 Well Mode changed to Drilled and Cased
1990-03-02 Drill Stem Test Performed
1990-03-02 Production Casing Operation Performed
1990-03-02 Rig Released
1990-03-11 Well Log Performed
1990-03-12 Perforation Treatment Performed - Jet Perforation
1990-03-13 Perforation Treatment Performed - Jet Perforation
1990-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-17 Perforation Treatment Performed - Jet Perforation
1990-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-02 Perforation Treatment Performed - Cement Squeeze
2001-04-02 Plug Back Performed
2001-04-03 Perforation Treatment Performed - Cement Squeeze
2001-04-03 Plug Back Performed
2001-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-06 Perforation Treatment Performed - Jet Perforation
2001-04-06 Plug Back Performed
2001-04-10 Well Began Production
2001-04-10 Well Fluid changed to Gas
2001-04-10 Well Mode changed to Flowing
2003-12-03 Well Fluid changed to Gas
2003-12-03 Well Mode changed to Suspended
2008-07-02 Perforation Treatment Performed - Cement Plug
2008-07-02 Plug Back Performed
2008-07-02 Well Fluid changed to Gas
2008-07-02 Well Mode changed to Abandoned Zone
2008-07-06 Perforation Treatment Performed - Jet Perforation
2008-07-06 Perforation Treatment Performed - Remedial Casing
2008-07-06 Well Log Performed
2008-07-07 Well Log Performed
2008-07-09 Perforation Treatment Performed - Jet Perforation
2008-07-09 Perforation Treatment Performed - Remedial Casing
2009-03-16 Well Log Performed
2017-11-25 Perforation Treatment Performed - Jet Perforation
2017-11-25 Well Log Performed
2018-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-22 Plug Back Performed
2018-02-23 Well Log Performed
2018-03-01 Perforation Treatment Performed - Jet Perforation
2018-03-01 Perforation Treatment Performed - Remedial Casing
2018-03-01 Well Log Performed
2018-10-26 Well Log Performed
2018-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-01 Well Log Performed
2018-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-02 Perforation Treatment Performed - Jet Perforation
2018-11-02 Well Log Performed
2018-11-03 Perforation Treatment Performed - Cement Plug
2018-11-03 Perforation Treatment Performed - Cement Squeeze
2018-11-03 Perforation Treatment Performed - Jet Perforation
2018-11-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-12 Perforation 506.50 507.30 13
2001-04-06 Perforation 644.50 646.00 17
2001-04-06 Packing Device Capped w/Cement 635.00 643.00 0
2001-04-06 Perforation 625.50 626.30 17
2008-07-02 Cement Plug 533.00 628.00 0
2008-07-06 Perforation 251.00 252.00 17
2008-07-06 Remedial Casing Cementing 251.00 252.00 0
2008-07-09 Perforation 177.00 178.00 17
2008-07-09 Remedial Casing Cementing 177.00 178.00 0
2017-11-25 Perforation 525.50 535.00 17
2018-02-22 Packing Device Capped w/Cement 512.00 520.00 0
1990-03-13 Perforation 502.00 504.00 13
2018-03-01 Perforation 425.00 426.00 14
2018-03-01 Remedial Casing Cementing 425.00 426.00 0
2018-11-01 Packing Device Capped w/Cement 487.00 495.00 0
2018-11-01 Packing Device Capped w/Cement 446.00 454.00 0
2018-11-02 Packing Device Capped w/Cement 411.00 419.00 0
2018-11-02 Perforation 185.00 186.00 23
2018-11-03 Cement Squeeze 185.00 186.00 0
2018-11-03 Cement Plug 175.00 183.00 0
2018-11-03 Perforation 160.00 160.50 23
2018-11-03 Cement Squeeze 160.00 160.50 0
1990-03-14 Acid Treatment 502.00 507.30 0
2018-11-03 Cement Plug 65.00 175.00 0
1990-03-17 Perforation 459.00 460.00 13
1990-03-17 Perforation 461.50 462.50 13
1990-03-17 Perforation 464.00 465.50 13
1990-03-19 Acid Treatment 459.00 465.50 0
2001-04-02 Cement Squeeze 502.00 507.30 0
2001-04-03 Cement Squeeze 459.00 465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3473 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-23 No Incident Encountered 0.00 0.00
2017-11-25 No Incident Encountered 0.00 0.00
2018-03-01 No Incident Encountered 0.00 0.00
2018-02-22 No Incident Encountered 0.00 0.00
2018-11-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References