X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514092711003

Well Details

Well ID: 0514092711003
Loading map...
Location: 00/11-27-051-09W4/3
Location Alias: 00/11-27-51-09 W4M
Location Alias 2: 00/11-27-051-09 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 09
Section: 27
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 11-27-51-9
Operator Name: Perpetual Operating Corp.
License Number: 0069766
License Date: 1978-05-29
License Status: Abandoned
Spud Date: 1978-06-26
Final Drill Date: 1978-07-03
Well Total Depth: 721.00 m
Surface Hole Latitude: 53.433814
Surface Hole Longitude: -111.243456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-29 Obtained License
1978-07-03 Finished Drilling
1978-07-03 Well Mode changed to Drilled and Cased
1978-07-06 Production Casing Operation Performed
1978-07-23 Perforation Treatment Performed - Jet Perforation
1986-06-22 Well Log Performed
1986-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-06-23 Plug Back Performed
1986-06-24 Perforation Treatment Performed - Jet Perforation
1986-10-15 Well Began Production
1986-10-15 Well Fluid changed to Gas
1986-10-15 Well Mode changed to Flowing
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Suspended
1994-12-01 Well Fluid changed to Gas
1994-12-01 Well Mode changed to Flowing
1999-03-01 Well Fluid changed to Gas
1999-03-01 Well Mode changed to Suspended
2000-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-05 Plug Back Performed
2000-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-06 Plug Back Performed
2000-06-20 Well Abandoned
2000-06-20 Well Fluid changed to Gas
2000-06-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-23 Perforation 675.40 676.70 7
2000-06-06 Packing Device Capped w/Cement 488.00 496.00 0
1978-07-23 Perforation 551.00 552.00 7
1978-07-23 Perforation 553.80 554.80 7
1986-06-23 Packing Device Capped w/Cement 662.60 670.60 0
1986-06-24 Perforation 551.10 552.30 13
1986-06-24 Perforation 553.50 555.30 13
1986-06-24 Perforation 506.60 507.50 13
1986-06-24 Perforation 511.50 512.70 13
2000-06-05 Packing Device Capped w/Cement 533.00 541.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 601 0.0 0.0 0.0
1987 1842 0.0 0.0 0.0
1988 676 0.0 0.0 0.0
1989 458 0.0 0.0 0.0
1990 960 0.0 0.0 0.0
1991 1271 0.0 0.0 0.0
1992 1006 0.0 0.0 0.0
1994 752 0.0 0.0 0.0
1995 29 0.0 0.0 0.0

For data sources see[5]

References