X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514021815AA2

Well Details

Well ID: 0514021815AA2
Loading map...
Location: AA/15-18-051-02W4/2
Location Alias: AA/15-18-51-02 W4M
Location Alias 2: AA/15-18-051-02 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 02
Section: 18
County/Municipality: County of Vermilion River
Well Name: CNRL B LLOYD 15-18-51-2
Operator Name: Canadian Natural Resources Limited
License Number: 0055994L
License Date: 1975-11-28
License Status: RecCertified
Spud Date: 1975-10-01
Final Drill Date: 1975-10-02
Well Total Depth: 582.50 m
Surface Hole Latitude: 53.406503
Surface Hole Longitude: -110.286714

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-02 Finished Drilling
1975-10-02 Rig Released
1975-10-02 Well Mode changed to Drilled and Cased
1975-10-14 Perforation Treatment Performed - Jet Perforation
1975-11-28 Obtained License
1976-01-01 Well Began Production
1976-01-01 Well Fluid changed to Crude Oil
1976-01-01 Well Mode changed to Pumping
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Suspended
2001-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-28 Plug Back Performed
2001-06-28 Well Fluid changed to Crude Oil
2001-06-28 Well Mode changed to Abandoned Zone
2001-07-19 Well Log Performed
2001-11-08 Perforation Treatment Performed - Jet Perforation
2001-11-08 Well Log Performed
2001-11-12 Perforation Treatment Performed - Cement Plug
2001-11-12 Perforation Treatment Performed - Remedial Casing
2001-11-22 Well Abandoned
2001-11-22 Well Fluid changed to Crude Oil
2001-11-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-14 Perforation 550.80 553.80 13
1975-10-14 Perforation 555.30 558.40 13
2001-06-28 Packing Device Capped w/Cement 537.50 545.50 0
2001-11-08 Perforation 139.00 142.00 12
2001-11-12 Remedial Casing Cementing 139.00 142.00 0
2001-11-12 Cement Plug 97.00 142.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2968 0.0 0.0 0.0
1977 4910 0.0 0.0 0.0
1978 3163 0.0 0.0 0.0
1979 936 0.0 0.0 0.0
1980 72 0.0 0.0 0.0
1981 552 0.0 0.0 0.0
1985 2446 0.0 0.0 0.0
1986 206 0.0 0.0 0.0
1987 1015 0.0 0.0 0.0

For data sources see[5]

References