X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514020810C00

Well Details

Well ID: 0514020810C00
Loading map...
Location: C0/10-08-051-02W4/0
Location Alias: C0/10-08-51-02 W4M
Location Alias 2: C0/10-08-051-02 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 02
Section: 08
County/Municipality: County of Vermilion River
Well Name: MOBIL-GC ET AL LLOYD 10C-8-51-2
Operator Name: ExxonMobil Canada Ltd.
License Number: 0059825
License Date: 1976-08-19
License Status: Abandoned
Spud Date: 1976-08-23
Final Drill Date: 1976-08-24
Well Total Depth: 595.00 m
Surface Hole Latitude: 53.390670
Surface Hole Longitude: -110.262081

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-19 Obtained License
1976-08-24 Finished Drilling
1976-08-24 Well Mode changed to Drilled and Cased
1976-08-25 Production Casing Operation Performed
1976-09-09 Perforation Treatment Performed - Jet Perforation
1976-09-24 Well Began Production
1976-09-24 Well Fluid changed to Crude Oil
1976-09-24 Well Mode changed to Pumping
1986-03-31 Well Fluid changed to Crude Oil
1986-03-31 Well Mode changed to Suspended
1993-10-22 Perforation Treatment Performed - Cement Plug
1993-10-22 Perforation Treatment Performed - Cement Squeeze
1993-10-22 Plug Back Performed
1993-10-22 Well Fluid changed to Crude Oil
1993-10-22 Well Mode changed to Abandoned
1994-11-01 Perforation Treatment Performed - Jet Perforation
1994-11-01 Perforation Treatment Performed - Remedial Casing
1995-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-09 Plug Back Performed
1995-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1995-06-18 Perforation Treatment Performed - Remedial Casing
1995-07-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-09 Perforation 570.00 572.40 13
1993-10-22 Cement Squeeze 570.00 572.40 0
1993-10-22 Cement Plug 549.50 558.50 0
1994-11-01 Perforation 426.00 427.20 7
1994-11-01 Perforation 438.00 439.20 7
1994-11-01 Remedial Casing Cementing 426.00 439.20 0
1995-06-09 Packing Device Capped w/Cement 417.00 433.00 0
1995-06-18 Hydra Jet Perforation 359.00 359.50 0
1995-06-18 Remedial Casing Cementing 359.00 359.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1114 0.0 0.0 0.0
1977 7923 0.0 0.0 0.0
1978 6740 0.0 0.0 0.0
1979 8167 0.0 0.0 0.0
1980 5376 0.0 0.0 0.0
1981 6294 0.0 0.0 0.0
1982 5078 0.0 0.0 0.0
1983 1564 0.0 0.0 0.0
1984 8691 0.0 0.0 0.0
1985 7822 0.0 0.0 0.0
1986 2104 0.0 0.0 0.0

For data sources see[5]

References