X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514011604C02

Well Details

Well ID: 0514011604C02
Loading map...
Location: C0/04-16-051-01W4/2
Location Alias: C0/04-16-51-01 W4M
Location Alias 2: C0/04-16-051-01 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 01
Section: 16
County/Municipality: County of Vermilion River
Well Name: CNRL C LLOYD 4-16-51-1
Operator Name: Canadian Natural Resources Limited
License Number: 0076589
License Date: 1979-06-27
License Status: Suspension
Spud Date: 1979-07-08
Final Drill Date: 1979-07-11
Well Total Depth: 690.00 m
Surface Hole Latitude: 53.398089
Surface Hole Longitude: -110.102754

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-27 Obtained License
1979-07-11 Finished Drilling
1979-07-11 Well Mode changed to Drilled and Cased
1979-07-14 Production Casing Operation Performed
1979-07-21 Perforation Treatment Performed - Jet Perforation
1979-09-18 Perforation Treatment Performed - Cement Squeeze
1979-09-20 Perforation Treatment Performed - Jet Perforation
1979-10-09 Perforation Treatment Performed - Jet Perforation
1979-10-10 Perforation Treatment Performed - Jet Perforation
1981-10-01 Perforation Treatment Performed - Jet Perforation
1996-05-29 Perforation Treatment Performed - Cement Squeeze
1996-06-01 Perforation Treatment Performed - Jet Perforation
1996-06-01 Well Log Performed
1996-07-01 Well Began Production
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Pumping
2007-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-28 Perforation Treatment Performed - Jet Perforation
2007-08-28 Plug Back Performed
2007-08-28 Well Fluid changed to Crude Oil
2007-08-28 Well Log Performed
2007-08-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-21 Perforation 559.50 560.60 13
2007-08-28 Perforation 515.50 516.50 26
1979-09-18 Cement Squeeze 559.50 560.60 0
1979-09-20 Perforation 560.00 562.00 13
1979-10-09 Perforation 553.50 554.00 13
1979-10-10 Perforation 553.50 554.00 13
1981-10-01 Perforation 558.50 563.00 13
1996-05-29 Cement Squeeze 553.50 563.00 0
1996-06-01 Perforation 573.00 576.00 26
2007-08-28 Packing Device Capped w/Cement 549.00 557.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5136 0.0 0.0 0.0
1997 8519 0.0 0.0 0.0
1998 8657 0.0 0.0 0.0
1999 8567 0.0 0.0 0.0
2000 8709 0.0 0.0 0.0
2001 8331 0.0 0.0 0.0
2002 8326 0.0 0.0 0.0
2003 8725 0.0 0.0 0.0
2004 8623 0.0 0.0 0.0
2005 7173 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 2716 0.0 0.0 0.0

For data sources see[5]

References