If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0514011408A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.39989,"lon":-110.03167,"icon":""}]} |
| Location: A0/08-14-051-01W4/0 | |
| Location Alias: A0/08-14-51-01 W4M | |
| Location Alias 2: A0/08-14-051-01 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 14 | |
| County/Municipality: County of Vermilion River | |
| Well Name: DEER CREEK LLOYD 8-14-51-1 | |
| Operator Name: Total E&P Canada Ltd. | |
| License Number: 0076853 | |
| License Date: 1979-07-11 | |
| License Status: RecCertified | |
| Spud Date: 1979-07-19 | |
| Final Drill Date: 1979-07-22 | |
| Well Total Depth: 676.00 m | |
| Surface Hole Latitude: 53.399890 | |
| Surface Hole Longitude: -110.031670 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-07-11 | Obtained License |
| 1979-07-22 | Finished Drilling |
| 1979-07-22 | Well Mode changed to Drilled and Cased |
| 1979-07-23 | Production Casing Operation Performed |
| 1979-08-22 | Perforation Treatment Performed - Jet Perforation |
| 1979-09-04 | Well Began Production |
| 1979-09-04 | Well Fluid changed to Crude Oil |
| 1979-09-04 | Well Mode changed to Pumping |
| 1980-10-31 | Well Fluid changed to Crude Oil |
| 1980-10-31 | Well Mode changed to Suspended |
| 1982-10-09 | Well Fluid changed to Crude Oil |
| 1982-10-09 | Well Mode changed to Flowing |
| 1983-06-30 | Well Fluid changed to Crude Oil |
| 1983-06-30 | Well Mode changed to Suspended |
| 1998-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-10-06 | Plug Back Performed |
| 1998-10-08 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-08 | Well Log Performed |
| 1998-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-10-24 | Plug Back Performed |
| 1998-10-27 | Well Abandoned |
| 1998-10-27 | Well Fluid changed to Crude Oil |
| 1998-10-27 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-08-22 | Perforation | 522.50 | 526.00 | 13 |
| 1979-08-22 | Perforation | 527.50 | 528.00 | 13 |
| 1979-08-22 | Perforation | 529.50 | 532.00 | 13 |
| 1998-10-06 | Packing Device Capped w/Cement | 509.30 | 517.30 | 0 |
| 1998-10-08 | Perforation | 494.20 | 495.20 | 18 |
| 1998-10-24 | Packing Device Capped w/Cement | 478.00 | 486.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 200 | 0.0 | 0.0 | 0.0 |
| 1980 | 4480 | 0.0 | 0.0 | 0.0 |
| 1982 | 948 | 0.0 | 0.0 | 0.0 |
For data sources see[5]