X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505222902000

Well Details

Well ID: 0505222902000
Loading map...
Location: 00/02-29-050-22W5/0
Location Alias: 00/02-29-50-22 W5M
Location Alias 2: 00/02-29-050-22 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 22
Section: 29
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ LAMBERT 2-29-50-22
Operator Name: Tourmaline Oil Corp.
License Number: 0493581
License Date: 2019-01-25
License Status: Amended
Spud Date: 2019-02-14
Final Drill Date: 2019-03-04
Well Total Depth: 4223.00 m
Surface Hole Latitude: 53.349779
Surface Hole Longitude: -117.195867

For data sources see[1][2]

Well History

Date Event
2019-01-25 Obtained License
2019-02-14 Well Log Performed
2019-02-16 Surface Casing Operation Performed
2019-02-19 Direction Drilling Operation Performed - Deviate
2019-02-22 Intermediate Casing Operation Performed
2019-02-24 Direction Drilling Operation Performed - Horizontal
2019-02-25 Well Log Performed
2019-03-04 Finished Drilling
2019-03-04 Well Log Performed
2019-03-04 Well Mode changed to Drilled and Cased
2019-03-05 Liner Casing Operation Performed
2019-03-06 Rig Released
2019-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Well Began Production
2019-03-21 Well Fluid changed to Gas
2019-03-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-14 Precision Drilling Technology Services Group Inc. 463 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-19 2383.80 Deviate (5 - 79 degrees)
2019-02-24 2820.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-14 Multi-Stage Fracture 4159.30 4159.40 0
2019-03-15 Multi-Stage Fracture 3697.50 3697.60 0
2019-03-15 Multi-Stage Fracture 3645.30 3645.40 0
2019-03-15 Multi-Stage Fracture 3592.70 3592.80 0
2019-03-15 Multi-Stage Fracture 3540.10 3540.20 0
2019-03-15 Multi-Stage Fracture 3487.60 3487.70 0
2019-03-15 Multi-Stage Fracture 3435.00 3435.10 0
2019-03-15 Multi-Stage Fracture 3382.50 3382.60 0
2019-03-15 Multi-Stage Fracture 3329.90 3330.00 0
2019-03-15 Multi-Stage Fracture 3277.40 3277.50 0
2019-03-15 Multi-Stage Fracture 3224.80 3224.90 0
2019-03-14 Multi-Stage Fracture 4117.80 4117.90 0
2019-03-15 Multi-Stage Fracture 3172.20 3172.30 0
2019-03-15 Multi-Stage Fracture 3119.70 3119.80 0
2019-03-16 Multi-Stage Fracture 3067.10 3067.20 0
2019-03-16 Multi-Stage Fracture 3014.60 3014.70 0
2019-03-16 Multi-Stage Fracture 2962.00 2962.10 0
2019-03-16 Multi-Stage Fracture 2909.40 2909.50 0
2019-03-16 Multi-Stage Fracture 2856.90 2857.00 0
2019-03-14 Multi-Stage Fracture 4065.30 4065.40 0
2019-03-14 Multi-Stage Fracture 4012.70 4012.80 0
2019-03-14 Multi-Stage Fracture 3960.20 3960.30 0
2019-03-15 Multi-Stage Fracture 3907.70 3907.80 0
2019-03-15 Multi-Stage Fracture 3855.10 3855.20 0
2019-03-15 Multi-Stage Fracture 3802.60 3802.70 0
2019-03-15 Multi-Stage Fracture 3750.10 3750.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-14 2019-03-16 2,692 6,331 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.7574 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.5871 N/A
silica crystalline 14808-60-7 100 3.5871 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.6629 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7935 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0127 N/A
dibromoacetonitrile 3252-43-5 100 0.0127 N/A
non-hazardous ingredients Not Available 100 0.0127 N/A
polyethylene glycol 25322-68-3 100 0.0127 N/A
sodium bromide 7647-15-6 100 0.0127 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0942 N/A
water Not Available 100 0.0942 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0493 N/A
non-hazardous ingredients Not Available 100 0.0493 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0425 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0425 N/A
methanol 67-56-1 100 0.0425 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0425 N/A
non-hazardous ingredients Not Available 100 0.0425 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-11 2019-03-11 Municipal Water 90
2019-03-15 2019-03-15 Oilfield Produced Water 1233
2019-03-13 2019-03-13 Recycled Fracturing Water (treated at well site) 1918
2019-03-13 2019-03-13 Recycled Fracturing Water (treated at well site) 1919
2019-03-14 2019-03-15 Recycled Fracturing Water (treated at well site) 571
2019-03-12 2019-03-12 Recycled Fracturing Water (treated at well site) 600

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6891 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-04 No Incident Encountered 0.00 0.00
2019-03-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References